Konfigurirajte proizvodnjo ogljika, obdelava procesnih plinov, obremenitev kotla in obremenitev s paro odjemalca kot povezanega sistema.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Kontinuirana karbonizacija
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, merjenje, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, vzdrževanje, low-gas operation and backup-steam behavior for the receiving plant.

REFERENČNA KONFIGURACIJA

Prenesite projektna dejstva v seznam opreme.

Ta referenčna matrika prikazuje logiko odločanja. Končne količine, modeli in vmesniki sodijo v odobren projektni predlog.

Sistemski blokTipičen obsegOsnova konfiguracije
Gas preparationPrah, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, merjenje, pressure control and backup interfaceMinimum, normal and peak customer demand
ODLOČENA POT ODLOČITVE

Napredujte s projektom le, ko so na voljo zahtevana dokazila.

Vsaka vrata spremenijo informacije o strankah v določen tehnični ali komercialni rezultat za naslednjo odločitev.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

IzhodMetered or documented steam-demand basis
02

Energijska bilanca

Match process-gas availability, internal heat demand and backup fuel.

IzhodVerified preliminary heat balance
03

Utility design

Define boiler, vodo, condensate, header and emissions interfaces.

IzhodConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

IzhodMeasurable project acceptance sheet
POGOSTA VPRAŠANJA O PROJEKTIH

Vprašanja, ki jih je treba rešiti pred konfiguracijo.

Odgovori določajo inženirsko mejo; ne nadomeščajo reprezentativnega testiranja materiala ali lokalnega pregleda skladnosti.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, zgorevanje, boiler, čiščenje vode, deaeration, blowdown, steam header, merjenje, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

PROJEKTNI INŽENIRSKI PREGLED

Pred izbiro opreme določite material.

Delite reprezentativen opis gradiva, razpoložljiva prostornina, status mesta in ciljne rezultate. YUSHUNXIN bo ta dejstva uporabil za pripravo ustrezne meje procesa in razprave o konfiguraciji.

Začni pregled projekta
KATALOŠKO USKLAJENA INŽENIRSKA PODLAGA

Karbonizacija z dovodom odpadne toplote s paro

Konfigurirajte karbonizacijsko linijo in sprejemno obremenitev s paro iz ene izmerjene toplotne in masne bilance.

01

Vhodni material

Pripravljena biomasa plus urni/dnevni profil krmljenja in ciljna specifikacija ogljika.

02

Pričakovani rezultati

Biooglje in kvalificiran tok odpadne toplote za dogovorjeno porabo pare.

03

Projektni vmesniki

Sušenje krme, karbonizacijski plin, zgorevanje, kotel na odpadno toploto, čiščenje vode, parni tlak/obremenitev in nadzor delovanja.

REGISTAR MODEL IN OBSEGA

Uporabite samo tisto vrstico, ki ustreza izbrani meji procesa.

Referenca katalogaZmogljivostMočFizična ovojnicaVključena meja
SXTD820Kontinuirana karbonizacija1–2 m³/h95 kW600 m² kataloška referenca zemljiščaPripravljena linija za kontinuirano karbonizacijo biomase
SXTD1200Kontinuirana karbonizacija3–5 m³/h110 kW650 m² kataloška referenca zemljiščaPripravljena linija za kontinuirano karbonizacijo biomase
SXTD1500Kontinuirana karbonizacija5–8 m³/h153 kW800 m² kataloška referenca zemljiščaPripravljena linija za kontinuirano karbonizacijo biomase
SXTD1800Kontinuirana karbonizacija8–10 m³/h178 kW800 m² kataloška referenca zemljiščaPripravljena linija za kontinuirano karbonizacijo biomase
SXTD2000 - 10–14 razredKontinuirana karbonizacija10–14 m³/h190 kW850 m² kataloška referenca zemljiščaKatalog natisne SXTD2000 za ta razred
SXTD2000 - 14–17 razredKontinuirana karbonizacija14–17 m³/h220 kW850 m² kataloška referenca zemljiščaKatalog ponavlja SXTD2000; koda končnega modela zahteva pisno potrditev

Konfiguracijsko pravilo: kataloška zmogljivost je referenca za načrtovanje. Stabilen pretok, instalirana/obratovalna moč, odtis, okrevanje, čistost, emisije in komunalno povpraševanje zahtevajo odobren seznam opreme, reprezentativno gradivo in pisni sprejemni pogoji.

Potrebne informacije pred konfiguracijo in ponudbo

  1. Reprezentativne materialne fotografije, specifikacije in razpoložljiv vzorec.
  2. Zahtevana zmogljivost plus ure na izmeno, izmene na dan in delovne dni.
  3. Ciljni rezultati, metoda vzorčenja in zahteve za spodnji sprejemnik.
  4. Država spletnega mesta, razpoložljiva moč, goriva, vodo, stisnjen zrak in gradbene omejitve.
  5. Lokalno okolje, ogenj, zahteve glede shranjevanja in varnosti pri delu.
  6. Zahtevana meja dostave: opremo, postavitev, namestitev, zagon in usposabljanje.