PROJECT-SPECIFIC THERMAL SYSTEM

Do not treat a reactor name or daily capacity as a complete project specification.

Grondstof, preparation, operating continuity, condensation, gas safety, product handling, milieucontroles, utilities and local delivery scope must be configured together.

A

Approved small-scale reference

YSX-F1 to YSX-F5 denote 1, 2, 3, 4 En 5 t/day skid or modular planning references for tire, plastic or oily-sludge trials.

B

Material balance

Olie, gas, solids and metal-bearing outputs require representative feedstock, stable-run data and an agreed sampling boundary.

C

Commercial boundary

Prices, operating costs, product value and return require dated quotations and local market evidence.

Source control: approved YOTO group product register. Final parameters are issued on the project-specific technical agreement.

The HTP-1000 name is retained as a project reference. Stable throughput, dryer duty, reactor configuration, gas treatment, controls and price require representative sludge analysis and a written quotation.

  • Het systeem heeft een jaarlijkse productiecapaciteit van circa 2,000 ton pyrolytische houtskool, die een aanzienlijke marktwaarde heeft. Verder, door energieterugwinning en koolstoffixatieproces, het vermindert koolstofdioxide uitstoot met ongeveer 1,500 ton per jaar, waarmee het doel van ecologische en economische coördinatie wordt bereikt.

  • 1000 kgh-productielijn voor slibpyrolyse

    Wat zijn de verschillen in efficiëntie tussen continue en intermitterende pyrolysesystemen?

    In pyrolyse-oplossingen voor gemeentelijke slibverwerkingsprojecten, verschillende pyrolyseprocesroutes hebben een directe invloed op de operationele efficiëntie en productkwaliteit. Onder deze, continue en batch-pyrolysesystemen vertegenwoordigen twee typische bedrijfsmodi, elk met unieke technische kenmerken en toepasbare scenario's.

    Vergelijking van continue en batch-pyrolysesystemen

    Intermitterende pyrolysesystemen werken voornamelijk batchgewijs. Na voltooiing van elke batch verwerking, het is noodzakelijk om resten te verwijderen, nieuw materiaal voeden, en start de volgende cyclus opnieuw. De voordelen zijn onder meer een eenvoudige structuur, lage apparatuurinvestering, en eenvoudige inbedrijfstelling, die geschikt is voor kleinschalige verwerking.

    In tegenstelling, continue pyrolysesystemen maken gebruik van schroeftransporteurs voor continue slibtoevoer, zodat de pyrolysereactie onder constante omstandigheden verloopt. Terwijl het systeemontwerp complexer is, het verbetert de verwerkingscapaciteit en operationele stabiliteit aanzienlijk, die geschikt is voor middelgrote tot grootschalige slibverwerkingsprojecten.

    Continue pyrolysesystemen bieden aanzienlijke voordelen op het gebied van energiegebruik. Er is minder warmteverlies omdat de reactietemperatuur binnen een relatief stabiel bereik kan blijven. Tegelijkertijd, de restwarmte van pyrolyse kan de reactietemperatuur op peil houden, om de zelfvoorziening op energiegebied te realiseren.

    Terwijl je in het intermitterende systeem zit, elke verwarmings- en koelcyclus veroorzaakt aanzienlijke energieschommelingen, resulterend in duidelijk warmteverlies. Daarom, als er geen alomvattend mechanisme voor de terugwinning van afvalwarmte bestaat, het energieverbruik voor de behandeling van een eenheid slib zal hoger zijn.

    Continue pyrolysesystemen maken een stabiele controle van parameters zoals temperatuur mogelijk, verblijftijd, en sfeer, zodat de kwaliteit van pyrolyseproducten consistenter zal zijn. Temperatuur- en atmosfeerschommelingen in batchsystemen zijn relatief scherp, het is dus moeilijk om nauwkeurige controle te bereiken. Dit kan onzekerheid met zich meebrengen in de daaropvolgende processen voor het terugwinnen van hulpbronnen. Anderzijds, intermitterende systemen bieden een flexibele werking, en optimalisatie van procesparameters vergemakkelijken, die geschikt is voor experimentele verwerking van diverse grondstoffen.

    We richten ons niet alleen op de pyrolysebehandeling van slib, maar beschikken ook over uitgebreide ervaring met het terugwinnen van vast afval, zoals pyrolysesysteem voor afvalbanden En pyrolyse-installatie voor afvalplastic. Neem onmiddellijk contact met ons op om uw eigen ontwerp aan te passen elektronisch afvalbeheersysteem.

    YUSHUNXIN
    YUSHUNXIN THERMAL CONVERSION

    Drilling waste, tank-bottom sludge, refinery sludge and marine oily residues differ in water, solids, hydrocarbons, salt, sulfur and metals. They should not share an assumed standard configuration.

    Reference three-dimensional layout of a continuous thermal conversion line
    01 / CONNECTED PROCESS

    Follow the material, vapor, vloeistof, gas and solid paths

    The reactor is one part of the line. Commercial operability depends on how each stream is prepared, transferred, controlled and discharged.

    1. 01Material characterization
    2. 02Feed preparation and sealed transfer
    3. 03Controlled thermal conversion
    4. 04Vapor separation and staged condensation
    5. 05Non-condensable gas safety and reuse
    6. 06Solid cooling, discharge and product handling
    02 / MATERIAL-SPECIFIC DESIGN

    Configuration questions that change the proposal

    The following points should be resolved before selecting a capacity or preparing a commercial quotation.

    Conditioning and dewatering

    High water content changes feeding stability and energy demand; pumping, mixing, dewatering or screw feeding may be required.

    Fouling and corrosion

    Salt, fine solids and heavy fractions influence reactor cleaning, metallurgy and condensation-system maintenance.

    Recovered phases

    Separate the project basis for recovered oil, water and treated solids, including sampling and permitted downstream use.

    Hazardous-waste boundary

    Licensing, residue classification, worker protection and emissions monitoring must be defined for the project jurisdiction.

    03 / OPERATING MODEL

    Make utilities and product outlets visible before investment

    A useful feasibility review connects the mass balance, energy balance, operating schedule and local product route.

    Operating schedule

    Define planned hours per day, shutdown windows, cleaning strategy, labor model and feedstock storage capacity.

    Energy integration

    Evaluate non-condensable gas reuse, startup fuel, electrical loads, cooling demand and optional downstream energy use as one balance.

    Quality control

    Set sampling points for incoming material, condensate fractions, recovered solids, wastewater and exhaust gas.

    Commercial boundary

    Budgetary results remain conditional until the feedstock, plaats, product route and local compliance requirements are confirmed.

    REFERENCE CONFIGURATION

    Translate project facts into an equipment list.

    This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.

    System blockTypical scopeConfiguration basis
    Receiving and conditioningSampling, mixing, screening, dewatering or pumpable-feed preparationWater, solids, salts and viscosity
    Controlled feedingAgitated buffer, pumps or screws, seals and isolationPhase stability and hazardous-waste controls
    Thermal treatmentReactor, verwarming, fouling management and cleanout accessHydrocarbon range, solids and corrosion basis
    Phase recoveryVapor separation, oil-water handling and treated-solid coolingSampling and permitted downstream routes
    Environmental and residueGas treatment, wastewater, residue containment and monitoringLocal licensing and acceptance tests
    STAGE-GATED DECISION PATH

    Advance the project only when the required evidence is available.

    Each gate turns customer information into a defined technical or commercial output for the next decision.

    01

    Waste characterization

    Sample water, olie, solids, salts, sulfur, metals and hazardous properties.

    OutputRepresentative waste profile
    02

    Conditioning trial

    Verify mixing, dewatering, pumping or screw-feeding requirements.

    OutputStable feed-preparation route
    03

    Output controls

    Define recovered phases, treated residue, wastewater and sampling methods.

    OutputPermitted output-management plan
    04

    Facility integration

    Confirm licensing, containment, nutsvoorzieningen, monitoring and acceptance.

    OutputSite-specific technical boundary
    PROJECT FAQ

    Questions to resolve before configuration.

    Answers define the engineering boundary; they do not replace representative material testing or local compliance review.

    What determines the continuous pyrolysis equipment list?

    Feedstock form, samenstelling, vocht, contamination, planned operating schedule, recovered-product route, site utilities and permit requirements determine the configuration.

    Can tires, plastics and oily sludge use exactly the same line?

    No. They may share thermal-conversion principles, but their preparation, feeding, corrosion, condensation, solid handling and environmental controls differ materially.

    Can recovered oil performance be guaranteed from a general material description?

    No. Representative analysis and an agreed sampling method are required before recovered-liquid quantity, quality or downstream use can be evaluated.

    What should be included in acceptance testing?

    Define feedstock, run duration, mass balance, operating stability, sampled outputs, nutsvoorzieningen, safety interlocks and the applicable emissions or residue tests.

    PROJECT ENGINEERING REVIEW

    Define the material before selecting the equipment.

    Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.

    Projectbeoordeling starten