PROJECT-SPECIFIC THERMAL SYSTEM

Do not treat a reactor name or daily capacity as a complete project specification.

Matière première, préparation, operating continuity, condensation, gas safety, product handling, contrôles environnementaux, utilities and local delivery scope must be configured together.

UN

Approved small-scale reference

YSX-F1 to YSX-F5 denote 1, 2, 3, 4 et 5 t/day skid or modular planning references for tire, plastic or oily-sludge trials.

B

Material balance

Huile, gaz, solids and metal-bearing outputs require representative feedstock, stable-run data and an agreed sampling boundary.

C

Limite commerciale

Prices, frais de fonctionnement, product value and return require dated quotations and local market evidence.

Source control: approved YOTO group product register. Final parameters are issued on the project-specific technical agreement.

The HTP-1000 name is retained as a project reference. Débit stable, dryer duty, reactor configuration, traitement des gaz, controls and price require representative sludge analysis and a written quotation.

  • The system has an annual production capacity of approximately 2,000 tons of pyrolytic charcoal, which holds significant market value. En outre, through energy recovery and carbon fixing process, it reduces carbon dioxide emissions by about 1,500 tons annually, which achieves the goal of ecological and economic coordination.

  • 1000 kgh Sludge Pyrolysis Production Line

    What are the differences in efficiency between continuous and intermittent pyrolysis systems?

    In pyrolysis solutions for municipal sludge treatment projects, different pyrolysis process routes directly impact operational efficiency and product quality. Parmi ceux-ci, continuous and batch pyrolysis systems represent two typical operating modes, each with unique technical characteristics and applicable scenarios.

    Comparison of Continuous and Batch Pyrolysis Systems

    Intermittent pyrolysis systems primarily operate in batches. After completing each batch of processing, it is necessary to remove residues, feed new material, and restart the next cycle. Its advantages include simple structure, low equipment investment, and easy commissioning, which is suitable for small-scale processing.

    En revanche, continuous pyrolysis systems utilize screw conveyors for continuous sludge feeding, so that the pyrolysis reaction proceeds under constant conditions. While the system design is more complex, it significantly enhances processing capacity and operational stability, which is suitable for medium to large-scale sludge treatment projects.

    Continuous pyrolysis systems offer significant advantages in energy utilization. There is less heat loss because the reaction temperature can remain within a relatively stable range. En même temps, the residual heat from pyrolysis can maintain the reaction temperature, so as to realize energy self-sufficiency.

    While in the intermittent system, each heating and cooling cycle causes significant energy fluctuations, resulting in obvious heat loss. Donc, if there is no comprehensive waste heat recovery mechanism, the energy consumption for treating a unit of sludge will be higher.

    Continuous pyrolysis systems enable stable control of parameters such as temperature, residence time, and atmosphere, so the quality of pyrolysis products will be more consistent. Temperature and atmosphere fluctuations in batch systems are relatively sharp, so it is difficult to achieve precise control. This may bring uncertainty to subsequent resource recovery processes. On the other hand, intermittent systems offer flexible operation, and facilitate optimization of process parameters, which is suitable for experimental processing of diverse raw materials.

    We not only focus on sludge pyrolysis treatment but also possess extensive experience in solid waste resource recovery, tel que système de pyrolyse des pneus usagés et Usine de pyrolyse des déchets plastiques. Contact us immediately to customize your own système de gestion des déchets électroniques.

    YUSHUNXIN
    CONVERSION THERMIQUE YUSHUNXIN

    Drilling waste, tank-bottom sludge, refinery sludge and marine oily residues differ in water, solids, hydrocarbons, salt, sulfur and metals. They should not share an assumed standard configuration.

    Implantation tridimensionnelle de référence d'une ligne de conversion thermique continue
    01 / PROCESSUS CONNECTÉ

    Suivez le matériel, vapeur, liquide, chemins gazeux et solides

    Le réacteur est une partie de la ligne. L'opérabilité commerciale dépend de la manière dont chaque flux est préparé, transféré, contrôlé et déchargé.

    1. 01Caractérisation des matériaux
    2. 02Préparation des aliments et transfert scellé
    3. 03Conversion thermique contrôlée
    4. 04Séparation des vapeurs et condensation par étapes
    5. 05Sécurité et réutilisation des gaz non condensables
    6. 06Refroidissement solide, déchargement et manutention des produits
    02 / CONCEPTION SPÉCIFIQUE AU MATÉRIAU

    Questions de configuration qui changent la proposition

    Les points suivants doivent être résolus avant de sélectionner une capacité ou de préparer une offre commerciale.

    Conditioning and dewatering

    High water content changes feeding stability and energy demand; pumping, mixing, dewatering or screw feeding may be required.

    Fouling and corrosion

    Salt, fine solids and heavy fractions influence reactor cleaning, metallurgy and condensation-system maintenance.

    Recovered phases

    Separate the project basis for recovered oil, water and treated solids, including sampling and permitted downstream use.

    Hazardous-waste boundary

    Licensing, residue classification, worker protection and emissions monitoring must be defined for the project jurisdiction.

    03 / MODÈLE OPÉRATIONNEL

    Rendre les services publics et les points de vente visibles avant l'investissement

    Une étude de faisabilité utile relie le bilan de masse, bilan énergétique, planning d'exploitation et itinéraire des produits locaux.

    Horaire d'exploitation

    Définir les heures planifiées par jour, fenêtres d'arrêt, stratégie de nettoyage, modèle de travail et capacité de stockage des matières premières.

    Intégration énergétique

    Évaluer la réutilisation des gaz non condensables, carburant de démarrage, charges électriques, la demande de refroidissement et la consommation d'énergie en aval en option comme un seul équilibre.

    Contrôle de qualité

    Définir des points d'échantillonnage pour le matériel entrant, fractions de condensat, solides récupérés, eaux usées et gaz d'échappement.

    Limite commerciale

    Les résultats budgétaires restent conditionnels jusqu'à ce que la matière première, site, l'itinéraire du produit et les exigences de conformité locales sont confirmés.

    CONFIGURATION DE RÉFÉRENCE

    Traduire les faits du projet dans une liste d'équipements.

    Cette matrice de référence montre la logique de décision. Quantités finales, les modèles et les interfaces appartiennent à la proposition de projet approuvée.

    Blocage systèmePortée typiqueBase de configuration
    Receiving and conditioningSampling, mixing, dépistage, dewatering or pumpable-feed preparationEau, solids, salts and viscosity
    Controlled feedingAgitated buffer, pumps or screws, seals and isolationPhase stability and hazardous-waste controls
    Traitement thermiqueRéacteur, chauffage, fouling management and cleanout accessHydrocarbon range, solids and corrosion basis
    Phase recoveryVapor separation, oil-water handling and treated-solid coolingSampling and permitted downstream routes
    Environmental and residueGas treatment, wastewater, residue containment and monitoringLocal licensing and acceptance tests
    CHEMIN DE DÉCISION PAR ÉTAPES

    Faire avancer le projet uniquement lorsque les preuves requises sont disponibles.

    Chaque porte transforme les informations client en un résultat technique ou commercial défini pour la prochaine décision.

    01

    Waste characterization

    Sample water, huile, solids, salts, soufre, metals and hazardous properties.

    SortirRepresentative waste profile
    02

    Conditioning trial

    Verify mixing, dewatering, pumping or screw-feeding requirements.

    SortirStable feed-preparation route
    03

    Output controls

    Define recovered phases, treated residue, wastewater and sampling methods.

    SortirPermitted output-management plan
    04

    Facility integration

    Confirm licensing, containment, utilitaires, monitoring and acceptance.

    SortirSite-specific technical boundary
    FAQ PROJET

    Questions à résoudre avant la configuration.

    Les réponses définissent les limites de l'ingénierie; ils ne remplacent pas les tests de matériaux représentatifs ou l'examen de conformité local.

    Qu'est-ce qui détermine la liste des équipements de pyrolyse continue?

    Forme de matière première, composition, humidité, contamination, calendrier d'exploitation prévu, parcours des produits récupérés, les utilitaires du site et les exigences en matière de permis déterminent la configuration.

    Les pneus peuvent-ils, les plastiques et les boues huileuses utilisent exactement la même ligne?

    Non. Ils peuvent partager les principes de conversion thermique, mais leur préparation, alimentation, corrosion, condensation, la manipulation solide et les contrôles environnementaux diffèrent sensiblement.

    Les performances de l’huile récupérée peuvent-elles être garanties à partir d’une description générale du matériau?

    Non. Une analyse représentative et une méthode d'échantillonnage convenue sont requises avant que la quantité de liquide récupérée, la qualité ou l’utilisation en aval peuvent être évaluées.

    Ce qui devrait être inclus dans les tests d'acceptation?

    Définir la matière première, durée d'exécution, bilan de masse, stabilité de fonctionnement, sorties échantillonnées, utilitaires, les verrouillages de sécurité et les tests d'émissions ou de résidus applicables.

    EXAMEN D'INGÉNIERIE DE PROJET

    Définir le matériel avant de sélectionner l'équipement.

    Partager une description matérielle représentative, volume disponible, état du site et résultats cibles. YUSHUNXIN utilisera ces faits pour préparer la discussion sur les limites du processus et la configuration pertinentes..

    Commencer l'examen du projet