Ne tretirajte naziv reaktora ili dnevni kapacitet kao potpunu specifikaciju projekta.
Sirovina, priprema, kontinuitet rada, kondenzacije, sigurnost gasa, rukovanje proizvodom, kontrole životne sredine, komunalne usluge i lokalni opseg isporuke moraju biti konfigurirani zajedno.
Odobrena mala referenca
YSX-F1 do YSX-F5 označavaju 1, 2, 3, 4 i 5 t/dan skid ili modularno planiranje referenci za gumu, ispitivanja plastike ili uljanog mulja.
Materijalni bilans
Ulje, gas, čvrste materije i proizvodi koji sadrže metal zahtevaju reprezentativnu sirovinu, stabilni podaci i dogovorena granica uzorkovanja.
Komercijalna granica
Cijene, operativni troškovi, vrijednost proizvoda i povrat zahtijevaju datirane ponude i dokaze na lokalnom tržištu.
Kontrola izvora: odobren registar proizvoda YOTO grupe. Konačni parametri se izdaju na tehničkom sporazumu za određeni projekat.
A continuous plastic-pyrolysis project adds controlled feeding, staged condensation, gas treatment and central controls. Uptime, energy demand, output routes and price require project confirmation.
Why Choose YUSHUNXIN?
We provide not only equipment but also turnkey solutions. These encompass raw material evaluation and process design, plant layout and equipment installation, operational training and maintenance guidance, as well as long-term technical optimization and after-sales service. Whether you are a plastic recycler, solid waste management company, or energy company in the circular economy, we can tailor the most cost-effective plastic-to-fuel project solution for you.
Osim toga, we can provide you with numerous other waste recycling systems, kao što je ekološki prihvatljivi načini pretvaranja guma u gorivo, postrojenje za pirolizu otpada mulja, projektno rješenje pirolize solarnih panela, and etc. If you have any other requirements, feel free to contact us immediately!
PE-, PP- and selected PS-rich streams can follow different thermal and condensation behavior. PVC, PET, brominated plastics, medical plastics and e-waste plastics require separate assessment.

Follow the material, vapor, liquid, gas and solid paths
The reactor is one part of the line. Commercial operability depends on how each stream is prepared, transferred, controlled and discharged.
- 01Material characterization
- 02Feed preparation and sealed transfer
- 03Controlled thermal conversion
- 04Vapor separation and staged condensation
- 05Non-condensable gas safety and reuse
- 06Solid cooling, discharge and product handling
Configuration questions that change the proposal
The following points should be resolved before selecting a capacity or preparing a commercial quotation.
Polymer composition
Confirm PE, PP, PS, PVC and PET proportions instead of describing the feed simply as mixed plastic.
Halogen control
PVC and brominated additives can change corrosion, gas-cleaning and recovered-liquid requirements.
Wax management
Plastic-derived vapors and liquids may require temperature-controlled lines, insulation and condensation staging.
Product route
Define whether recovered liquid is intended for permitted fuel use, refinery feed evaluation or another locally accepted outlet.
Make utilities and product outlets visible before investment
A useful feasibility review connects the mass balance, energy balance, operating schedule and local product route.
Operating schedule
Define planned hours per day, shutdown windows, cleaning strategy, labor model and feedstock storage capacity.
Energy integration
Evaluate non-condensable gas reuse, startup fuel, electrical loads, cooling demand and optional downstream energy use as one balance.
Quality control
Set sampling points for incoming material, condensate fractions, recovered solids, wastewater and exhaust gas.
Komercijalna granica
Budgetary results remain conditional until the feedstock, site, product route and local compliance requirements are confirmed.
See the connected equipment boundary.
Reference visuals support early layout discussion. Final equipment, arrangement and interfaces are confirmed from the project material and site.
Translate project facts into an equipment list.
This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.
| System block | Typical scope | Configuration basis |
|---|---|---|
| Polymer preparation | Sortiranje, shredding, drying and removal of incompatible fractions | PE, PP, PS, PVC, PET and additive profile |
| Feed and conversion | Density control, sealed transfer, reactor and heating system | Bulk density, melt behavior and operating duty |
| Wax and liquid handling | Temperature-controlled vapor lines, staged condensation and storage | Wax tendency and target recovered-liquid route |
| Halogen and gas control | Material exclusion, corrosion review and gas-treatment provisions | PVC, brominated additives and local limits |
| Residue and utilities | Solid discharge, cooling, water and electrical interfaces | Residue classification and site conditions |
Unaprijedite projekat samo kada su potrebni dokazi dostupni.
Svaka kapija pretvara informacije o klijentima u definirani tehnički ili komercijalni rezultat za sljedeću odluku.
Polymer screen
Quantify target polymers, PVC, PET, aditivi, moisture and contamination.
IzlazAccepted and excluded feed specificationTermalna ruta
Validate feeding, ponašanje voska, condensation and corrosion controls.
IzlazMaterial-specific process routeProduct and permit
Confirm recovered-product status, outlets and local environmental boundary.
IzlazCommercial and compliance evidence packConfiguration review
Freeze preparation, reactor, oporavak, utilities and acceptance interfaces.
IzlazProject configuration basisPitanja koja treba riješiti prije konfiguracije.
Odgovori definiraju inženjersku granicu; oni ne zamjenjuju reprezentativno testiranje materijala ili lokalni pregled usklađenosti.
What determines the continuous pyrolysis equipment list?
Feedstock form, kompozicija, vlage, kontaminacije, planned operating schedule, recovered-product route, site utilities and permit requirements determine the configuration.
Can tires, plastics and oily sludge use exactly the same line?
br. They may share thermal-conversion principles, but their preparation, hranjenje, corrosion, kondenzacije, solid handling and environmental controls differ materially.
Can recovered oil performance be guaranteed from a general material description?
br. Representative analysis and an agreed sampling method are required before recovered-liquid quantity, quality or downstream use can be evaluated.
What should be included in acceptance testing?
Define feedstock, run duration, mass balance, operating stability, sampled outputs, komunalne usluge, safety interlocks and the applicable emissions or residue tests.
Definirajte materijal prije odabira opreme.
Podijelite reprezentativni opis materijala, dostupan volumen, status lokacije i ciljne rezultate. YUSHUNXIN će koristiti te činjenice da pripremi relevantnu diskusiju o granicama procesa i konfiguraciji.




