Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced Фотоэлектр пиролиз технологияһы to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, site utilities, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Эшкәртеү ҡәҙере | 1 т/сәғ (1,000 кг/сәғ.) |
| Glass Recovery Rate | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Килгән материал .
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Көтөлгән һөҙөмтәләр
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Проект интерфейстары
Mechanical route: dust and material handling. Thermal route: газ, cooling and environmental controls in addition.
Һайланған процесс сигенә тап килгән рәтте генә ҡулланығыҙ.
| Каталог белешмәһе | Һыйымлыҡ | Көс | Физик конверт | Ҡушылған сик |
|---|---|---|---|---|
| YSX-M1000Single-glass mechanical | 1 т/сәғ | 277.6 кВт | 36 × 6 × 6 m | Integrated mechanical line |
| YSX-TK1000Tunnel thermal | 1,000 кг/сәғ. | 126.65 кВт | 72 × 13 × 7.5 m | Continuous tunnel thermal line |
Конфигурациялау ҡағиҙәһе: каталог һыйҙырышлылығы планлаштырыу белешмәһе булып тора. Тотороҡло үткәреүсәнлек, ҡуйылған/эшләү ҡөҙрәте, аяҡ эҙе, тергеҙелеү, сафлыҡ, эмиссия һәм коммуналь хеҙмәттәргә ихтыяж раҫланған ҡорамалдар исемлеген талап итә, вәкиллекле материал һәм яҙма ҡабул итеү шарттары.
Конфигурация һәм котировка алдынан кәрәкле мәғлүмәт
- Вәкиллекле материал фотоһүрәттәре, техник характеристикалар һәм бар өлгө.
- Кәрәкле ҡеүәт плюс сәғәт сменаһына, Тәүлегенә 2 смена һәм эш көндәре.
- Маҡсатлы һөҙөмтәләр, Һайлау ысулы һәм аҫҡы ағымдағы ҡабул итеүсе талаптар.
- Сайт иле, булған ҡеүәт, яғыулыҡ, һыу, ҡыҫылған һауа һәм бина сиктәре.
- Урындағы экологик, ут, һаҡлау һәм хеҙмәт хәүефһеҙлеге талаптары.
- Һоралған тапшырыу сиге: йыһазландырыу, ойоштороу, ҡуйыу, файҙаланыуға тапшырыу һәм уҡытыу.