Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced PV-pyrolysetechnologie to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, site utilities, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 e (1,000 kg/u) |
| Glass Recovery Rate | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Binnenkomend materiaal
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Verwachte resultaten
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Projectinterfaces
Mechanical route: dust and material handling. Thermal route: gas, cooling and environmental controls in addition.
Gebruik alleen de rij die overeenkomt met de geselecteerde procesgrens.
| Catalogusreferentie | Capaciteit | Stroom | Fysieke envelop | Inbegrepen grens |
|---|---|---|---|---|
| YSX-M1000Enkelglas mechanisch | 1 e | 277.6 kW | 36 × 6 × 6 M | Geïntegreerde mechanische lijn |
| YSX-TK1000Thermische tunnel | 1,000 kg/u | 126.65 kW | 72 × 13 × 7.5 M | Doorlopende thermische tunnellijn |
Configuratieregel: cataloguscapaciteit is een planningsreferentie. Stabiele doorvoer, geïnstalleerd/bedrijfsvermogen, voetafdruk, herstel, zuiverheid, emissies en de vraag naar nutsvoorzieningen vereisen een goedgekeurde uitrustingslijst, representatief materiaal en schriftelijke acceptatievoorwaarden.
Informatie vereist vóór configuratie en offerte
- Representatieve materiaalfoto's, specificaties en beschikbaar monster.
- Benodigde capaciteit plus uren per dienst, ploegendiensten per dag en werkdagen.
- Doeluitgangen, bemonsteringsmethode en vereisten voor de stroomafwaartse ontvanger.
- Land van de site, beschikbaar vermogen, brandstof, water, perslucht en bouwgrenzen.
- Lokaal milieu, vuur, opslag- en arbeidsveiligheidseisen.
- Gevraagde leveringsgrens: apparatuur, indeling, installatie, inbedrijfstelling en training.