Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced Технология фотопиролиза to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, утилиты сайта, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 т/ч (1,000 кг/ч) |
| Glass Recovery Rate | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Входящий материал
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Ожидаемые результаты
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Интерфейсы проекта
Mechanical route: dust and material handling. Термальный маршрут: газ, cooling and environmental controls in addition.
Используйте только строку, соответствующую выбранной границе процесса..
| Ссылка на каталог | Емкость | Власть | Физическая оболочка | Включенная граница |
|---|---|---|---|---|
| YSX-M1000Одинарное стекло механическое | 1 т/ч | 277.6 кВт | 36 × 6 × 6 м | Интегрированная механическая линия |
| YSX-TK1000Туннель тепловой | 1,000 кг/ч | 126.65 кВт | 72 × 13 × 7.5 м | Непрерывная туннельная тепловая линия |
Правило конфигурации: емкость каталога является ориентиром для планирования. Стабильная пропускная способность, установленная/рабочая мощность, след, восстановление, чистота, выбросы и спрос на коммунальные услуги требуют утвержденного списка оборудования, репрезентативный материал и письменные условия приемки.
Информация, необходимая перед конфигурацией и предложением
- Репрезентативные фотографии материалов, Технические характеристики и доступный образец.
- Требуемая мощность плюс часы в смену, смен в день и рабочие дни.
- Целевые результаты, метод отбора проб и требования к приемнику ниже по потоку.
- Страна сайта, доступная мощность, топливо, вода, сжатый воздух и ограничения здания.
- Местная экология, огонь, требования к хранению и охране труда.
- Запрошенная граница доставки: оборудование, макет, установка, ввод в эксплуатацию и обучение.