Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced Technologie de pyrolyse photovoltaïque to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, site utilities, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 ème (1,000 kg/heure) |
| Glass Recovery Rate | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Matériel entrant
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Résultats attendus
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Interfaces du projet
Mechanical route: dust and material handling. Thermal route: gaz, cooling and environmental controls in addition.
Utiliser uniquement la ligne correspondant à la limite du processus sélectionné.
| Référence catalogue | Capacité | Pouvoir | Enveloppe physique | Limite incluse |
|---|---|---|---|---|
| YSX-M1000Mécanique mono-verre | 1 ème | 277.6 kW | 36 × 6 × 6 m | Ligne mécanique intégrée |
| YSX-TK1000Tunnel thermique | 1,000 kg/heure | 126.65 kW | 72 × 13 × 7.5 m | Ligne thermique tunnel continue |
Règle de configuration: la capacité du catalogue est une référence de planification. Débit stable, puissance installée/fonctionnelle, empreinte, récupération, pureté, les émissions et la demande des services publics nécessitent la liste des équipements approuvés, matériel représentatif et conditions d’acceptation écrites.
Informations requises avant configuration et devis
- Photos matérielles représentatives, spécifications et échantillon disponible.
- Capacité requise plus heures par équipe, équipes par jour et jours ouvrables.
- Résultats visés, méthode d'échantillonnage et exigences du récepteur en aval.
- Pays du site, puissance disponible, carburant, eau, air comprimé et limites du bâtiment.
- Environnement local, feu, exigences en matière de stockage et de sécurité au travail.
- Limite de livraison demandée: équipement, mise en page, installation, mise en service et formation.