Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
קאַסע סטודיע: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced PV pyrolysis technology to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, site utilities, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| פּראַסעסינג קאַפּאַציטעט | 1 ה/ה (1,000 קג/ה) |
| Glass Recovery Rate | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Incoming material
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Expected outputs
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Project interfaces
Mechanical route: dust and material handling. Thermal route: גאַז, cooling and environmental controls in addition.
Use only the row matching the selected process boundary.
| Catalogue reference | קאַפּאַציטעט | מאַכט | Physical envelope | Included boundary |
|---|---|---|---|---|
| YSX-M1000Single-glass mechanical | 1 ה/ה | 277.6 kW | 36 × 6 × 6 m | Integrated mechanical line |
| YSX-TK1000Tunnel thermal | 1,000 קג/ה | 126.65 kW | 72 × 13 × 7.5 m | Continuous tunnel thermal line |
Configuration rule: catalogue capacity is a planning reference. Stable throughput, installed/operating power, footprint, recovery, purity, emissions and utility demand require the approved equipment list, representative material and written acceptance conditions.
Information required before configuration and quotation
- Representative material photos, specifications and available sample.
- Required capacity plus hours per shift, shifts per day and operating days.
- ציל אַוטפּוץ, sampling method and downstream receiver requirements.
- Site country, available power, fuel, וואַסער, compressed air and building limits.
- Local environmental, fire, storage and occupational-safety requirements.
- Requested delivery boundary: ויסריכט, אויסלייג, ייַנמאָנטירונג, commissioning and training.