Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced ПВ пиролиз технологиясе to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, сайт коммуналь хезмәтләре, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 t/h (1,000 кг / с) |
| Пыяла торгызу дәрәҗәсе | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Килүче материал
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Көтелгән нәтиҗәләр
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Проект интерфейслары
Mechanical route: dust and material handling. Thermal route: газ, cooling and environmental controls in addition.
Сайланган процесс чикләренә туры килгән рәтне кулланыгыз.
| Каталог сылтамасы | Потенциал | Көч | Физик конверт | Керелгән чик |
|---|---|---|---|---|
| YSX-M1000Single-glass mechanical | 1 t/h | 277.6 кВт | 36 × 6 × 6 m | Integrated mechanical line |
| YSX-TK1000Tunnel thermal | 1,000 кг / с | 126.65 кВт | 72 × 13 × 7.5 m | Continuous tunnel thermal line |
Конфигурация кагыйдәсе: каталог сыйдырышлыгы - планлаштыру белешмәсе. Тотрыклы үткәрү, урнаштырылган / эш көче, эз, торгызу, чисталык, чыгару һәм файдалы сорау расланган җиһазлар исемлеген таләп итә, вәкиллекле материал һәм язма кабул итү шартлары.
Конфигурация һәм цитаталар алдыннан кирәкле мәгълүмат
- Вәкил материал фотолары, спецификацияләр һәм булган үрнәк.
- Кирәкле сыйдырышлык һәм сменага сәгатьләр, көнгә смена һәм эш көннәре.
- Максатлы нәтиҗәләр, сайлау ысулы һәм түбән агымдагы кабул итүче таләпләре.
- Сайт иле, булган көч, ягулык, су, кысылган һава һәм төзелеш чикләре.
- Localирле әйләнә-тирә мохит, ут, саклау һәм хезмәт-куркынычсызлык таләпләре.
- Тапшыру чикләре: җиһаз, макет, урнаштыру, тапшыру һәм укыту.