Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?

Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.

Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling

One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.

Its process flow incorporates advanced PV-pyrolyseteknologi to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, driftsplan, site utilities, environmental controls and the agreed acceptance method.

Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.

1000kgh solar panel recycling plant in japan
Parameter Specification
Processing Capacity 1 t/t (1,000 kg/t)
Utvinningsgrad for glass Confirm by project test
Silver Enrichment Concentrated in fine powder fraction — premium feedstock for silver refiners
Copper Recovery Copper-bearing fraction; confirm purity and downstream acceptance
Silicon Enrichment High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners
KATALOG-JUSTERT INGENIØRGRUNNLAG

Mechanical or tunnel thermal - not interchangeable

The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.

01

Innkommende materiale

Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.

02

Forventede utganger

Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.

03

Prosjektgrensesnitt

Mechanical route: dust and material handling. Thermal route: gass, cooling and environmental controls in addition.

MODELL OG OMFANGSREGISTRET

Bruk kun raden som samsvarer med den valgte prosessgrensen.

KatalogreferanseKapasitetMaktFysisk konvoluttInkludert grense
YSX-M1000Mekanisk enkeltglass1 t/t277.6 kW36 × 6 × 6 mIntegrert mekanisk linje
YSX-TK1000Tunnel termisk1,000 kg/t126.65 kW72 × 13 × 7.5 mKontinuerlig tunnel termisk linje

Konfigurasjonsregel: katalogkapasitet er en planleggingsreferanse. Stabil gjennomstrømning, installert/driftskraft, fotspor, bedring, renhet, utslipp og bruksbehov krever godkjent utstyrsliste, representativt materiale og skriftlige akseptbetingelser.

Informasjon nødvendig før konfigurasjon og tilbud

  1. Representative materialbilder, spesifikasjoner og tilgjengelig prøve.
  2. Nødvendig kapasitet pluss timer per skift, skift per dag og driftsdager.
  3. Mål utganger, prøvetakingsmetode og nedstrøms mottakerkrav.
  4. Nettstedets land, tilgjengelig kraft, brensel, vann, trykkluft og bygningsgrenser.
  5. Lokalt miljø, ild, krav til oppbevaring og yrkessikkerhet.
  6. Forespurt leveringsgrense: utstyr, layout, installasjon, igangkjøring og opplæring.