Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced PV-pyrolyseteknologi to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, driftsplan, site utilities, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 t/t (1,000 kg/t) |
| Utvinningsgrad for glass | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Innkommende materiale
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Forventede utganger
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Prosjektgrensesnitt
Mechanical route: dust and material handling. Thermal route: gass, cooling and environmental controls in addition.
Bruk kun raden som samsvarer med den valgte prosessgrensen.
| Katalogreferanse | Kapasitet | Makt | Fysisk konvolutt | Inkludert grense |
|---|---|---|---|---|
| YSX-M1000Mekanisk enkeltglass | 1 t/t | 277.6 kW | 36 × 6 × 6 m | Integrert mekanisk linje |
| YSX-TK1000Tunnel termisk | 1,000 kg/t | 126.65 kW | 72 × 13 × 7.5 m | Kontinuerlig tunnel termisk linje |
Konfigurasjonsregel: katalogkapasitet er en planleggingsreferanse. Stabil gjennomstrømning, installert/driftskraft, fotspor, bedring, renhet, utslipp og bruksbehov krever godkjent utstyrsliste, representativt materiale og skriftlige akseptbetingelser.
Informasjon nødvendig før konfigurasjon og tilbud
- Representative materialbilder, spesifikasjoner og tilgjengelig prøve.
- Nødvendig kapasitet pluss timer per skift, skift per dag og driftsdager.
- Mål utganger, prøvetakingsmetode og nedstrøms mottakerkrav.
- Nettstedets land, tilgjengelig kraft, brensel, vann, trykkluft og bygningsgrenser.
- Lokalt miljø, ild, krav til oppbevaring og yrkessikkerhet.
- Forespurt leveringsgrense: utstyr, layout, installasjon, igangkjøring og opplæring.