Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced Technologia pirolizy fotowoltaicznej to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, harmonogram operacyjny, site utilities, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 t/godz (1,000 kg/godz) |
| Szybkość odzyskiwania szkła | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Przychodzący materiał
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Oczekiwane wyniki
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Interfejsy projektu
Mechanical route: dust and material handling. Thermal route: gaz, cooling and environmental controls in addition.
Użyj tylko wiersza odpowiadającego wybranej granicy procesu.
| Odniesienie do katalogu | Pojemność | Moc | Koperta fizyczna | Uwzględniona granica |
|---|---|---|---|---|
| YSX-M1000Mechaniczne z pojedynczą szybą | 1 t/godz | 277.6 kW | 36 × 6 × 6 M | Zintegrowana linia mechaniczna |
| YSX-TK1000Tunel termiczny | 1,000 kg/godz | 126.65 kW | 72 × 13 × 7.5 M | Ciągła linia termiczna tunelu |
Reguła konfiguracji: Pojemność katalogu jest punktem odniesienia podczas planowania. Stabilna przepustowość, moc zainstalowana/operacyjna, ślad stopy, powrót do zdrowia, czystość, emisji i zapotrzebowania na media wymagają zatwierdzonej listy wyposażenia, reprezentatywny materiał i pisemne warunki akceptacji.
Informacje wymagane przed konfiguracją i wyceną
- Reprezentatywne zdjęcia materiału, specyfikacje i dostępną próbkę.
- Wymagana wydajność plus godziny na zmianę, zmian w ciągu dnia i dni roboczych.
- Docelowe wyjścia, metoda pobierania próbek i wymagania dotyczące dalszego odbiornika.
- Kraj witryny, dostępna moc, paliwo, woda, sprężone powietrze i ograniczenia budowlane.
- Lokalne środowisko, ogień, wymagania dotyczące przechowywania i bezpieczeństwa pracy.
- Żądana granica dostawy: sprzęt, układ, instalacja, uruchomienie i szkolenie.
