Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced PV pyrolyse teknologi to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, webstedsværktøjer, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 t/t (1,000 kg/t) |
| Glass Recovery Rate | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Indgående materiale
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Forventede output
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Projektgrænseflader
Mechanical route: dust and material handling. Termisk rute: gas, cooling and environmental controls in addition.
Brug kun den række, der matcher den valgte procesgrænse.
| Katalog reference | Kapacitet | Magt | Fysisk konvolut | Inkluderet grænse |
|---|---|---|---|---|
| YSX-M1000Single-glass mechanical | 1 t/t | 277.6 kW | 36 × 6 × 6 m | Integrated mechanical line |
| YSX-TK1000Tunnel thermal | 1,000 kg/t | 126.65 kW | 72 × 13 × 7.5 m | Continuous tunnel thermal line |
Konfigurationsregel: Katalogkapacitet er en planlægningsreference. Stabil gennemstrømning, installeret/driftseffekt, fodspor, bedring, renhed, emissioner og forsyningsbehov kræver den godkendte udstyrsliste, repræsentativt materiale og skriftlige acceptbetingelser.
Oplysninger påkrævet før konfiguration og tilbud
- Repræsentative materialebilleder, specifikationer og tilgængelig prøve.
- Påkrævet kapacitet plus timer pr, vagter pr dag og arbejdsdage.
- Mål output, prøveudtagningsmetode og krav til downstream-modtagere.
- Site land, tilgængelig strøm, brændstof, vand, trykluft og bygningsgrænser.
- Lokalt miljø, brand, krav til opbevaring og arbejdssikkerhed.
- Anmodet leveringsgrænse: udstyr, layout, installation, idriftsættelse og træning.
