Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Xook ti' jump'éel óoltaj: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced Ma'alo'obtal u pirólisis PV to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, utilidades le ts'ono'oto', environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 t/h (1,000 kg/h) |
| Glass Recovery Rate | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Xooko'ob ku yokol
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Ba'ax ku páa'ta'al
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Interfaces ti' le proyecto
Mechanical route: dust and material handling. Thermal route: gas, cooling and environmental controls in addition.
Meyaj chéen le fila ku nupikubáa yéetel u xuul le tuukula' yéeya'ano'.
| Referencia ti' le catálogo | Páajtalil | Muuk | Sobre físico | Límite incluido |
|---|---|---|---|---|
| YSX-M1000Mecánico u chéen vidrio | 1 t/h | 277.6 kW | 36 × 6 × 6 m | Internet ichil mecánica integrada |
| YSX-TK1000Térmico ti' le túnel | 1,000 kg/h | 126.65 kW | 72 × 13 × 7.5 m | internet ichil térmica u túnel continuo |
Regla u configuración: le Buka'aj u ba'al u catálogo jach jump'éel k'a'ana'an u planificación. Rendimiento estable, instalado/funcionamiento u páajtalil, u yooko'ob, ch'a' óol, pureza, emisiones yéetel demanda utilidad k'a'abet le tsoolol nu'ukulil aprobado, xooko'ob representativos yéetel condiciones u k'a'amal ts'íib.
A'almaj t'aan k'a'abéet bey ma' u configuración yéetel cita
- Fotos u material representativo, especificaciones yéetel muestra disponible.
- Buka'aj u ba'al k'a'abéet asab horas tumen turno, k'eexpajal tumen k'iin yéetel k'iino'ob meyaj.
- Salidas objetivo, método u muestreo yéetel requisitos receptor abajo de le corriente.
- Lu'umil le ts'ono'oto', páajtalil yaan, kóombustible, ja', iik' comprimido yéetel límites edificio.
- Ka'a jeets'el tu'ux, k'áak', almacenamiento yéetel requisitos ti' seguridad ocupacional.
- Límite u k'u'ubul k'áata'an: nu'ukulil, díisposision, instalación, puesta tu marcha yéetel formación.
