Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?

Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.

Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling

One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.

Its process flow incorporates advanced PV пиролизна технология to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, работен график, site utilities, environmental controls and the agreed acceptance method.

Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.

1000kgh solar panel recycling plant in japan
Parameter Specification
Processing Capacity 1 т/ч (1,000 кг/ч)
Степен на възстановяване на стъкло Confirm by project test
Silver Enrichment Concentrated in fine powder fraction — premium feedstock for silver refiners
Copper Recovery Copper-bearing fraction; confirm purity and downstream acceptance
Silicon Enrichment High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners
ИНЖЕНЕРНА ОСНОВА ПО КАТАЛОГ

Mechanical or tunnel thermal - not interchangeable

The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.

01

Входящ материал

Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.

02

Очаквани резултати

Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.

03

Интерфейси на проекта

Mechanical route: dust and material handling. Thermal route: газ, cooling and environmental controls in addition.

МОДЕЛ И ОБХВАТ РЕГИСТЪР

Използвайте само реда, съответстващ на избраната граница на процеса.

Справка в каталогаКапацитетМощностФизическа обвивкаВключена граница
YSX-M1000Single-glass mechanical1 т/ч277.6 kW36 × 6 × 6 мIntegrated mechanical line
YSX-TK1000Тунелна термична1,000 кг/ч126.65 kW72 × 13 × 7.5 мНепрекъсната тунелна термична линия

Правило за конфигуриране: капацитетът на каталога е справка за планиране. Стабилна производителност, инсталирана/работна мощност, отпечатък, възстановяване, чистота, емисиите и търсенето на комунални услуги изискват списък с одобрено оборудване, представителни материални и писмени условия за приемане.

Необходима информация преди конфигурация и оферта

  1. Представителни материални снимки, спецификации и налична проба.
  2. Необходим капацитет плюс часове на смяна, смени на ден и работни дни.
  3. Целеви резултати, метод на вземане на проби и изисквания към приемника надолу по веригата.
  4. Държава на сайта, налична мощност, гориво, вода, сгъстен въздух и строителни ограничения.
  5. Местна екология, огън, изисквания за съхранение и безопасност на труда.
  6. Заявена граница на доставка: оборудване, оформление, монтаж, въвеждане в експлоатация и обучение.