Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Continuous carbonization
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, traitement, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / BASE D'ACCEPTATION

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, entretien, low-gas operation and backup-steam behavior for the receiving plant.

CONFIGURATION DE RÉFÉRENCE

Traduire les faits du projet dans une liste d'équipements.

Cette matrice de référence montre la logique de décision. Quantités finales, les modèles et les interfaces appartiennent à la proposition de projet approuvée.

Blocage systèmePortée typiqueBase de configuration
Gas preparationPoussière, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryEn-tête, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
CHEMIN DE DÉCISION PAR ÉTAPES

Faire avancer le projet uniquement lorsque les preuves requises sont disponibles.

Chaque porte transforme les informations client en un résultat technique ou commercial défini pour la prochaine décision.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

SortirMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

SortirVerified preliminary heat balance
03

Utility design

Define boiler, eau, condensate, header and emissions interfaces.

SortirConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

SortirMeasurable project acceptance sheet
FAQ PROJET

Questions à résoudre avant la configuration.

Les réponses définissent les limites de l'ingénierie; ils ne remplacent pas les tests de matériaux représentatifs ou l'examen de conformité local.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

EXAMEN D'INGÉNIERIE DE PROJET

Définir le matériel avant de sélectionner l'équipement.

Partager une description matérielle représentative, volume disponible, état du site et résultats cibles. YUSHUNXIN utilisera ces faits pour préparer la discussion sur les limites du processus et la configuration pertinentes..

Commencer l'examen du projet
BASE D'INGÉNIERIE ALIGNÉE SUR LE CATALOGUE

Carbonization with waste-heat steam supply

Configure the carbonization line and receiving steam load from one measured heat and mass balance.

01

Matériel entrant

Prepared biomass plus hourly/daily feed profile and target carbon specification.

02

Résultats attendus

Biochar and a qualified waste-heat stream for an agreed steam duty.

03

Interfaces du projet

Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.

REGISTRE DE MODÈLE ET DE PORTÉE

Utiliser uniquement la ligne correspondant à la limite du processus sélectionné.

Référence catalogueCapacitéPouvoirEnveloppe physiqueLimite incluse
SXTD820Continuous carbonization1–2 m³/h95 kW600 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1200Continuous carbonization3–5 m³/h110 kW650 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1500Continuous carbonization5–8 m³/h153 kW800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1800Continuous carbonization8–10 m³/h178 kW800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD2000 - 10–14 classContinuous carbonization10–14 m³/h190 kW850 m² catalogue land referenceCatalogue prints SXTD2000 for this class
SXTD2000 - 14–17 classContinuous carbonization14–17 m³/h220 kW850 m² catalogue land referenceCatalogue repeats SXTD2000; final model code requires written confirmation

Règle de configuration: la capacité du catalogue est une référence de planification. Débit stable, puissance installée/fonctionnelle, empreinte, récupération, pureté, les émissions et la demande des services publics nécessitent la liste des équipements approuvés, matériel représentatif et conditions d’acceptation écrites.

Informations requises avant configuration et devis

  1. Photos matérielles représentatives, spécifications et échantillon disponible.
  2. Capacité requise plus heures par équipe, équipes par jour et jours ouvrables.
  3. Résultats visés, méthode d'échantillonnage et exigences du récepteur en aval.
  4. Pays du site, puissance disponible, carburant, eau, air comprimé et limites du bâtiment.
  5. Environnement local, feu, exigences en matière de stockage et de sécurité au travail.
  6. Limite de livraison demandée: équipement, mise en page, installation, mise en service et formation.