YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Өҙлөкһөҙ углеродлашыу
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ҠАБУЛ ИТЕҮ НИГЕҘЕ

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.

REFERENCE CONFIGURATION

Translate project facts into an equipment list.

This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.

System blockTypical scopeConfiguration basis
Gas preparationСаң, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
STAGE-GATED DECISION PATH

Advance the project only when the required evidence is available.

Each gate turns customer information into a defined technical or commercial output for the next decision.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

OutputMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

OutputVerified preliminary heat balance
03

Utility design

Define boiler, һыу, condensate, header and emissions interfaces.

OutputConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

OutputMeasurable project acceptance sheet
ФАК ПРОЕКТЫ

Questions to resolve before configuration.

Answers define the engineering boundary; they do not replace representative material testing or local compliance review.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, яныу, boiler, һыуҙы таҙартыу, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

PROJECT ENGINEERING REVIEW

Define the material before selecting the equipment.

Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.

Проектты тикшерергә башлау
КАТАЛОГ-ТИҘӘЛЕШТЕРЕЛГӘН ИНЖЕНЕРЛЫК НИГЕҘҘӘРЕ

Ҡалдыҡ-йылылыҡ пар менән тәьмин итеү менән карбонизация

Конфигурациялау углеродизация линияһы һәм ҡабул итеү пар йөк бер үлсәү йылылыҡ һәм масса балансы.

01

Килгән материал .

Әҙерләнгән биомасса плюс сәғәт/көндәлек аҙыҡ профиле һәм маҡсатлы углерод спецификацияһы.

02

Көтөлгән һөҙөмтәләр

Биоугар һәм килешелгән пар бурысы өсөн квалификациялы ҡалдыҡ-йылылыҡ ағымы.

03

Проект интерфейстары

Аҙыҡ киптереү ., карбонлаштырыу газы, яныу, ҡалдыҡ йылылыҡ ҡаҙанлығы, һыуҙы таҙартыу, пар баҫымы/йөк һәм эш менән идара итеү.

МОДЕЛЬ ҺӘМ КҮЛӘМ РЕГИСТРЫ

Һайланған процесс сигенә тап килгән рәтте генә ҡулланығыҙ.

Каталог белешмәһеҺыйымлыҡКөсФизик конвертҠушылған сик
СХТД820Өҙлөкһөҙ углеродлашыу1–2 м3/сәғ.95 кВт600 м2 каталог ер белешмәһеӘҙерләнгән биомасса өҙлөкһөҙ карбонизация линияһы
1200 СХТДӨҙлөкһөҙ углеродлашыу3–5 м3/сәғ.110 кВт650 м2 каталог ер белешмәһеӘҙерләнгән биомасса өҙлөкһөҙ карбонизация линияһы
1500 СХТДӨҙлөкһөҙ углеродлашыу5–8 м3/сәғ153 кВт800 м2 каталог ер белешмәһеӘҙерләнгән биомасса өҙлөкһөҙ карбонизация линияһы
1800 СХТДӨҙлөкһөҙ углеродлашыу8–10 м3/сәғ.178 кВт800 м2 каталог ер белешмәһеӘҙерләнгән биомасса өҙлөкһөҙ карбонизация линияһы
СХТД2000 - 10–14 класс .Өҙлөкһөҙ углеродлашыу10–14 м3/сәғ.190 кВт850 м2 каталог ер белешмәһеБыл класс өсөн SXTD2000 каталогы баҫа
СХТД2000 - 14–17 класс .Өҙлөкһөҙ углеродлашыу14–17 м3/сәғ.220 кВт850 м2 каталог ер белешмәһеКаталог ҡабатлай SXTD2000; Һуңғы модель коды яҙма раҫлауҙы талап итә

Конфигурациялау ҡағиҙәһе: каталог һыйҙырышлылығы планлаштырыу белешмәһе булып тора. Тотороҡло үткәреүсәнлек, ҡуйылған/эшләү ҡөҙрәте, аяҡ эҙе, тергеҙелеү, сафлыҡ, эмиссия һәм коммуналь хеҙмәттәргә ихтыяж раҫланған ҡорамалдар исемлеген талап итә, вәкиллекле материал һәм яҙма ҡабул итеү шарттары.

Конфигурация һәм котировка алдынан кәрәкле мәғлүмәт

  1. Вәкиллекле материал фотоһүрәттәре, техник характеристикалар һәм бар өлгө.
  2. Кәрәкле ҡеүәт плюс сәғәт сменаһына, Тәүлегенә 2 смена һәм эш көндәре.
  3. Маҡсатлы һөҙөмтәләр, Һайлау ысулы һәм аҫҡы ағымдағы ҡабул итеүсе талаптар.
  4. Сайт иле, булған ҡеүәт, яғыулыҡ, һыу, ҡыҫылған һауа һәм бина сиктәре.
  5. Урындағы экологик, ут, һаҡлау һәм хеҙмәт хәүефһеҙлеге талаптары.
  6. Һоралған тапшырыу сиге: йыһазландырыу, ойоштороу, ҡуйыу, файҙаланыуға тапшырыу һәм уҡытыу.