Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.
Turn stable carbonization heat into useful industrial steam.
A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Keep carbon quality and steam reliability under separate control
The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.
- 01Biomass drying and feeding
- 02Continuous carbonization
- 03Dust and condensable separation
- 04Gas cleaning and controlled combustion
- 05Steam generation and water treatment
- 06Distribution, metering and backup supply
Define the user before defining the boiler
Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.
Steam demand
Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.
Water system
Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.
Fuel stability
Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.
Interface boundary
Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.
Verify both carbon output and usable steam
Acceptance should be based on documented feedstock, operating conditions and measurement methods.
Carbon product
Record yield and product properties only against the tested biomass and agreed thermal program.
Steam output
Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.
Emissions boundary
Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.
Continuity plan
Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.
Туташкан жабдуулардын чектерин караңыз.
Шилтеме визуалдык визуалдык визуалдык материалдар макеттин эрте талкуусун колдойт. Акыркы жабдуулар, жайгаштыруу жана интерфейстер долбоордун материалынан жана сайтынан тастыкталган.
Долбоордун фактыларын жабдуулардын тизмесине которуу.
Бул шилтеме матрицасы чечим логикасын көрсөтөт. Акыркы өлчөмдөр, моделдер жана интерфейстер бекитилген долбоор сунушуна таандык.
| Системалык блок | Типтүү масштаб | Конфигурациянын негизи |
|---|---|---|
| Gas preparation | Чаң, condensable and moisture control with safe buffering | Carbonization-gas variability and burner limits |
| Combustion system | Controlled burner, combustion chamber and safety interlocks | Steam duty, turndown and supplementary-fuel plan |
| Boiler island | Boiler, economizer, blowdown, instruments and protection | Pressure, temperature and operating code basis |
| Water and condensate | Treatment, deaeration, make-up water and condensate return | Source-water quality and user return conditions |
| Steam delivery | Header, metering, pressure control and backup interface | Минималдуу, normal and peak customer demand |
Долбоорду талап кылынган далилдер болгондо гана алдыга жылдырыңыз.
Ар бир дарбаза кардарлардын маалыматын кийинки чечим үчүн аныкталган техникалык же коммерциялык натыйжага айлантат.
Load profile
Capture minimum, normal and peak demand plus continuity requirements.
ЧыгууMetered or documented steam-demand basisEnergy balance
Match process-gas availability, internal heat demand and backup fuel.
ЧыгууVerified preliminary heat balanceUtility design
Define boiler, суу, condensate, header and emissions interfaces.
ЧыгууConnected utility configurationAcceptance plan
Agree test feedstock, stable window, meters and backup behavior.
ЧыгууMeasurable project acceptance sheetКонфигурациядан мурун чечиле турган суроолор.
Жооптор инженердик чекти аныктайт; алар репрезентативдик материалдарды сыноону же жергиликтүү шайкештикти карап чыгууну алмаштырбайт.
What information is needed from the steam user?
Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.
Can process gas alone guarantee continuous steam supply?
Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.
What belongs in the steam-system boundary?
The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.
How should steam acceptance be measured?
Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.
Жабдууларды тандоодон мурун материалды аныктаңыз.
Өкүл материалдын сүрөттөмөсүн бөлүшүңүз, жеткиликтүү көлөм, сайттын абалы жана максаттуу жыйынтыктар. YUSHUNXIN бул фактыларды тиешелүү процесстин чегин жана конфигурация талкуусун даярдоо үчүн колдонот.
Carbonization with waste-heat steam supply
Configure the carbonization line and receiving steam load from one measured heat and mass balance.
Кирүүчү материал
Prepared biomass plus hourly/daily feed profile and target carbon specification.
Күтүлгөн жыйынтыктар
Biochar and a qualified waste-heat stream for an agreed steam duty.
Долбоор интерфейстери
Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.
Тандалган процесстин чегине дал келген сапты гана колдонуңуз.
| Каталог маалымдамасы | Кубаттуулугу | Күч | Физикалык конверт | Чек ара камтылган |
|---|---|---|---|---|
| SXTD820Continuous carbonization | 1–2 m³/h | 95 кВт | 600 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1200Continuous carbonization | 3–5 m³/h | 110 кВт | 650 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1500Continuous carbonization | 5–8 m³/h | 153 кВт | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1800Continuous carbonization | 8–10 m³/h | 178 кВт | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD2000 - 10–14 classContinuous carbonization | 10–14 m³/h | 190 кВт | 850 m² catalogue land reference | Catalogue prints SXTD2000 for this class |
| SXTD2000 - 14–17 classContinuous carbonization | 14–17 m³/h | 220 кВт | 850 m² catalogue land reference | Catalogue repeats SXTD2000; final model code requires written confirmation |
Конфигурация эрежеси: каталогдун кубаттуулугу пландаштыруу маалымдамасы болуп саналат. Туруктуу өткөрүү, орнотулган/иштөө күчү, из, калыбына келтирүү, тазалык, чыгаруу жана коммуналдык суроо-талап бекитилген жабдуулардын тизмесин талап кылат, өкүлчүлүгү материалдык жана жазуу жүзүндөгү кабыл алуу шарттары.
Конфигурациядан жана цитатадан мурун талап кылынган маалымат
- Өкүл материалдык сүрөттөр, спецификациялар жана жеткиликтүү үлгү.
- Керектүү кубаттуулук плюс сменасына саат, суткасына сменалар жана иш күндөрү.
- Максаттуу жыйынтыктар, үлгү алуу ыкмасы жана ылдый агымдагы кабыл алуучу талаптар.
- Сайт өлкөсү, жеткиликтүү күч, күйүүчү май, суу, кысылган аба жана курулуш чектөөлөр.
- Жергиликтүү экология, от, сактоо жана эмгекти коргоо талаптары.
- Суралган жеткирүү чеги: жабдуулар, макет, орнотуу, ишке киргизуу жана окутуу.