Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Continuous carbonization
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.

МААЛЫМАТ КОНФИГУРАЦИЯСЫ

Долбоордун фактыларын жабдуулардын тизмесине которуу.

Бул шилтеме матрицасы чечим логикасын көрсөтөт. Акыркы өлчөмдөр, моделдер жана интерфейстер бекитилген долбоор сунушуна таандык.

Системалык блокТиптүү масштабКонфигурациянын негизи
Gas preparationЧаң, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceМинималдуу, normal and peak customer demand
ЭТАПТАГАН ЧЕЧИМДЕР ЖОЛУ

Долбоорду талап кылынган далилдер болгондо гана алдыга жылдырыңыз.

Ар бир дарбаза кардарлардын маалыматын кийинки чечим үчүн аныкталган техникалык же коммерциялык натыйжага айлантат.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

ЧыгууMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

ЧыгууVerified preliminary heat balance
03

Utility design

Define boiler, суу, condensate, header and emissions interfaces.

ЧыгууConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

ЧыгууMeasurable project acceptance sheet
ДОЛБООР боюнча КБС

Конфигурациядан мурун чечиле турган суроолор.

Жооптор инженердик чекти аныктайт; алар репрезентативдик материалдарды сыноону же жергиликтүү шайкештикти карап чыгууну алмаштырбайт.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

ДОЛБООРУ ИНЖЕНЕРЛЕРДИК КАРОО

Жабдууларды тандоодон мурун материалды аныктаңыз.

Өкүл материалдын сүрөттөмөсүн бөлүшүңүз, жеткиликтүү көлөм, сайттын абалы жана максаттуу жыйынтыктар. YUSHUNXIN бул фактыларды тиешелүү процесстин чегин жана конфигурация талкуусун даярдоо үчүн колдонот.

Долбоорду карап чыгууну баштоо
КАТАЛОГТУУ ИНЖЕНЕРЛЕРДИН НЕГИЗИ

Carbonization with waste-heat steam supply

Configure the carbonization line and receiving steam load from one measured heat and mass balance.

01

Кирүүчү материал

Prepared biomass plus hourly/daily feed profile and target carbon specification.

02

Күтүлгөн жыйынтыктар

Biochar and a qualified waste-heat stream for an agreed steam duty.

03

Долбоор интерфейстери

Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.

МОДЕЛЬ ЖАНА КОЛДОНУУ РЕСТЕР

Тандалган процесстин чегине дал келген сапты гана колдонуңуз.

Каталог маалымдамасыКубаттуулугуКүчФизикалык конвертЧек ара камтылган
SXTD820Continuous carbonization1–2 m³/h95 кВт600 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1200Continuous carbonization3–5 m³/h110 кВт650 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1500Continuous carbonization5–8 m³/h153 кВт800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1800Continuous carbonization8–10 m³/h178 кВт800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD2000 - 10–14 classContinuous carbonization10–14 m³/h190 кВт850 m² catalogue land referenceCatalogue prints SXTD2000 for this class
SXTD2000 - 14–17 classContinuous carbonization14–17 m³/h220 кВт850 m² catalogue land referenceCatalogue repeats SXTD2000; final model code requires written confirmation

Конфигурация эрежеси: каталогдун кубаттуулугу пландаштыруу маалымдамасы болуп саналат. Туруктуу өткөрүү, орнотулган/иштөө күчү, из, калыбына келтирүү, тазалык, чыгаруу жана коммуналдык суроо-талап бекитилген жабдуулардын тизмесин талап кылат, өкүлчүлүгү материалдык жана жазуу жүзүндөгү кабыл алуу шарттары.

Конфигурациядан жана цитатадан мурун талап кылынган маалымат

  1. Өкүл материалдык сүрөттөр, спецификациялар жана жеткиликтүү үлгү.
  2. Керектүү кубаттуулук плюс сменасына саат, суткасына сменалар жана иш күндөрү.
  3. Максаттуу жыйынтыктар, үлгү алуу ыкмасы жана ылдый агымдагы кабыл алуучу талаптар.
  4. Сайт өлкөсү, жеткиликтүү күч, күйүүчү май, суу, кысылган аба жана курулуш чектөөлөр.
  5. Жергиликтүү экология, от, сактоо жана эмгекти коргоо талаптары.
  6. Суралган жеткирүү чеги: жабдуулар, макет, орнотуу, ишке киргизуу жана окутуу.