A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Patuloy na carbonization
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, pagpapanatili, low-gas operation and backup-steam behavior for the receiving plant.

REFERENCE CONFIGURATION

Translate project facts into an equipment list.

This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.

System blockTypical scopeConfiguration basis
Gas preparationAlikabok, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
STAGE-GATED DECISION PATH

Advance the project only when the required evidence is available.

Each gate turns customer information into a defined technical or commercial output for the next decision.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

OutputMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

OutputVerified preliminary heat balance
03

Utility design

Define boiler, tubig, condensate, header and emissions interfaces.

OutputConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

OutputMeasurable project acceptance sheet
PROJECT FAQ

Questions to resolve before configuration.

Answers define the engineering boundary; they do not replace representative material testing or local compliance review.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, pagkasunog, boiler, paggamot ng tubig, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

PROJECT ENGINEERING REVIEW

Define the material before selecting the equipment.

Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.

Simulan ang Pagsusuri ng Proyekto
CATALOGUE-ALIGNED ENGINEERING BASE

Carbonization na may waste-heat steam supply

I-configure ang linya ng carbonization at pagtanggap ng steam load mula sa isang sinusukat na balanse ng init at masa.

01

Papasok na materyal

Inihanda ang biomass kasama ang oras-oras/araw-araw na profile ng feed at target na detalye ng carbon.

02

Mga inaasahang output

Biochar at isang kwalipikadong waste-heat stream para sa isang napagkasunduang steam duty.

03

Mga interface ng proyekto

Pagpatuyo ng feed, carbonization gas, pagkasunog, waste-heat boiler, paggamot ng tubig, steam pressure/load at operating control.

MODELO AT SAKLAW REGISTER

Gamitin lamang ang row na tumutugma sa napiling hangganan ng proseso.

Sanggunian ng katalogoKapasidadkapangyarihanPisikal na sobreKasamang hangganan
SXTD820Patuloy na carbonization1–2 m³/h95 kW600 m² catalog land referenceInihanda ang tuloy-tuloy na linya ng carbonization ng biomass
SXTD1200Patuloy na carbonization3–5 m³/h110 kW650 m² catalog land referenceInihanda ang tuloy-tuloy na linya ng carbonization ng biomass
SXTD1500Patuloy na carbonization5–8 m³/h153 kW800 m² catalog land referenceInihanda ang tuloy-tuloy na linya ng carbonization ng biomass
SXTD1800Patuloy na carbonization8–10 m³/h178 kW800 m² catalog land referenceInihanda ang tuloy-tuloy na linya ng carbonization ng biomass
SXTD2000 - 10-14 na klasePatuloy na carbonization10–14 m³/h190 kW850 m² catalog land referenceCatalog prints SXTD2000 para sa klase na ito
SXTD2000 - 14–17 klasePatuloy na carbonization14–17 m³/h220 kW850 m² catalog land referenceInuulit ng Catalog ang SXTD2000; Ang panghuling code ng modelo ay nangangailangan ng nakasulat na kumpirmasyon

Panuntunan sa pagsasaayos: Ang kapasidad ng katalogo ay isang sanggunian sa pagpaplano. Matatag na throughput, naka-install/operating power, bakas ng paa, pagbawi, kadalisayan, ang mga emisyon at pangangailangan ng utility ay nangangailangan ng inaprubahang listahan ng kagamitan, kinatawan ng materyal at nakasulat na mga kondisyon sa pagtanggap.

Kinakailangan ang impormasyon bago ang pagsasaayos at pagsipi

  1. Mga larawan ng kinatawan ng materyal, mga pagtutukoy at magagamit na sample.
  2. Kinakailangang kapasidad at oras sa bawat shift, mga shift bawat araw at araw ng pagpapatakbo.
  3. Mga target na output, paraan ng sampling at mga kinakailangan sa downstream na receiver.
  4. Bansa ng site, magagamit na kapangyarihan, panggatong, tubig, compressed air at mga limitasyon ng gusali.
  5. Lokal na kapaligiran, apoy, imbakan at mga kinakailangan sa kaligtasan sa trabaho.
  6. Hiniling na hangganan ng paghahatid: kagamitan, layout, pag-install, komisyon at pagsasanay.