Turn stable carbonization heat into useful industrial steam.
A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Keep carbon quality and steam reliability under separate control
The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.
- 01Biomass drying and feeding
- 02निरंतर जलकर कोयला होना
- 03Dust and condensable separation
- 04Gas cleaning and controlled combustion
- 05Steam generation and water treatment
- 06Distribution, metering and backup supply
Define the user before defining the boiler
Food and chemical plants require a clear hourly steam profile, दबाव, quality and continuity basis.
Steam demand
Provide minimum, normal and peak demand, operating hours, दबाव, temperature and seasonal production schedule.
Water system
Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.
Fuel stability
Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.
Interface boundary
Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.
Verify both carbon output and usable steam
Acceptance should be based on documented feedstock, operating conditions and measurement methods.
Carbon product
Record yield and product properties only against the tested biomass and agreed thermal program.
Steam output
Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.
Emissions boundary
Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.
Continuity plan
Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.
See the connected equipment boundary.
Reference visuals support early layout discussion. Final equipment, arrangement and interfaces are confirmed from the project material and site.
Translate project facts into an equipment list.
This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.
| System block | Typical scope | Configuration basis |
|---|---|---|
| Gas preparation | धूल, condensable and moisture control with safe buffering | Carbonization-gas variability and burner limits |
| Combustion system | Controlled burner, combustion chamber and safety interlocks | Steam duty, turndown and supplementary-fuel plan |
| Boiler island | Boiler, economizer, blowdown, instruments and protection | Pressure, temperature and operating code basis |
| Water and condensate | Treatment, deaeration, make-up water and condensate return | Source-water quality and user return conditions |
| Steam delivery | Header, metering, pressure control and backup interface | न्यूनतम, normal and peak customer demand |
आवश्यक साक्ष्य उपलब्ध होने पर ही परियोजना को आगे बढ़ाएं.
प्रत्येक गेट ग्राहक की जानकारी को अगले निर्णय के लिए एक परिभाषित तकनीकी या वाणिज्यिक आउटपुट में बदल देता है.
Load profile
Capture minimum, normal and peak demand plus continuity requirements.
उत्पादनMetered or documented steam-demand basisEnergy balance
Match process-gas availability, internal heat demand and backup fuel.
उत्पादनVerified preliminary heat balanceUtility design
Define boiler, पानी, condensate, header and emissions interfaces.
उत्पादनConnected utility configurationAcceptance plan
Agree test feedstock, stable window, meters and backup behavior.
उत्पादनMeasurable project acceptance sheetकॉन्फ़िगरेशन से पहले हल करने योग्य प्रश्न.
उत्तर इंजीनियरिंग सीमा को परिभाषित करते हैं; वे प्रतिनिधि सामग्री परीक्षण या स्थानीय अनुपालन समीक्षा को प्रतिस्थापित नहीं करते हैं.
What information is needed from the steam user?
Provide minimum, normal and peak steam demand, दबाव, temperature, operating schedule, condensate return, water quality and continuity requirement.
Can process gas alone guarantee continuous steam supply?
Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.
What belongs in the steam-system boundary?
The scope may include gas treatment, दहन, boiler, जल उपचार, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.
How should steam acceptance be measured?
Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.
उपकरण चुनने से पहले सामग्री को परिभाषित करें.
एक प्रतिनिधि सामग्री विवरण साझा करें, उपलब्ध मात्रा, साइट की स्थिति और लक्ष्य आउटपुट. YUSHUNXIN प्रासंगिक प्रक्रिया सीमा और कॉन्फ़िगरेशन चर्चा तैयार करने के लिए उन तथ्यों का उपयोग करेगा.
अपशिष्ट-गर्मी भाप आपूर्ति के साथ कार्बोनाइजेशन
एक मापा ताप और द्रव्यमान संतुलन से कार्बोनाइजेशन लाइन और भाप भार प्राप्त करने को कॉन्फ़िगर करें.
आने वाली सामग्री
तैयार बायोमास प्लस प्रति घंटा/दैनिक फ़ीड प्रोफ़ाइल और लक्ष्य कार्बन विनिर्देश.
अपेक्षित आउटपुट
सहमत भाप शुल्क के लिए बायोचार और एक योग्य अपशिष्ट-गर्मी धारा.
प्रोजेक्ट इंटरफ़ेस
चारा सुखाना, कार्बोनाइजेशन गैस, दहन, कचरा जलाने का यंत्र, जल उपचार, भाप दबाव/भार और परिचालन नियंत्रण.
केवल चयनित प्रक्रिया सीमा से मेल खाने वाली पंक्ति का उपयोग करें.
| कैटलॉग संदर्भ | क्षमता | शक्ति | भौतिक आवरण | शामिल सीमा |
|---|---|---|---|---|
| SXTD820निरंतर जलकर कोयला होना | 1-2 मी³/घंटा | 95 किलोवाट | 600 वर्ग मीटर सूची भूमि संदर्भ | तैयार बायोमास सतत कार्बोनाइजेशन लाइन |
| SXTD1200निरंतर जलकर कोयला होना | 3-5 m³/घंटा | 110 किलोवाट | 650 वर्ग मीटर सूची भूमि संदर्भ | तैयार बायोमास सतत कार्बोनाइजेशन लाइन |
| एसएक्सटीडी1500निरंतर जलकर कोयला होना | 5-8 मी³/घंटा | 153 किलोवाट | 800 वर्ग मीटर सूची भूमि संदर्भ | तैयार बायोमास सतत कार्बोनाइजेशन लाइन |
| एसएक्सटीडी1800निरंतर जलकर कोयला होना | 8-10 मी³/घंटा | 178 किलोवाट | 800 वर्ग मीटर सूची भूमि संदर्भ | तैयार बायोमास सतत कार्बोनाइजेशन लाइन |
| SXTD2000 - 10-14 वर्गनिरंतर जलकर कोयला होना | 10-14 मी³/घंटा | 190 किलोवाट | 850 वर्ग मीटर सूची भूमि संदर्भ | कैटलॉग इस वर्ग के लिए SXTD2000 प्रिंट करता है |
| SXTD2000 - 14-17 वर्गनिरंतर जलकर कोयला होना | 14-17 मी³/घंटा | 220 किलोवाट | 850 वर्ग मीटर सूची भूमि संदर्भ | कैटलॉग SXTD2000 को दोहराता है; अंतिम मॉडल कोड के लिए लिखित पुष्टि की आवश्यकता होती है |
कॉन्फ़िगरेशन नियम: कैटलॉग क्षमता एक नियोजन संदर्भ है. स्थिर थ्रूपुट, स्थापित/परिचालन शक्ति, पदचिह्न, वसूली, पवित्रता, उत्सर्जन और उपयोगिता मांग के लिए अनुमोदित उपकरण सूची की आवश्यकता होती है, प्रतिनिधि सामग्री और लिखित स्वीकृति शर्तें.
कॉन्फ़िगरेशन और कोटेशन से पहले आवश्यक जानकारी
- प्रतिनिधि सामग्री तस्वीरें, विशिष्टताएँ और उपलब्ध नमूना.
- आवश्यक क्षमता प्लस घंटे प्रति शिफ्ट, प्रति दिन शिफ्ट और परिचालन दिवस.
- लक्ष्य आउटपुट, नमूनाकरण विधि और डाउनस्ट्रीम रिसीवर आवश्यकताएँ.
- साइट देश, उपलब्ध शक्ति, ईंधन, पानी, संपीड़ित हवा और भवन सीमाएँ.
- स्थानीय पर्यावरण, आग, भंडारण और व्यावसायिक-सुरक्षा आवश्यकताएँ.
- अनुरोधित वितरण सीमा: उपकरण, लेआउट, इंस्टालेशन, कमीशनिंग और प्रशिक्षण.