Konfigirasyon pwodiksyon kabòn, pwosesis-tretman gaz, devwa chofaj ak chaj la vapè kliyan kòm yon sistèm konekte.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Karbonizasyon kontinyèl
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.

REFERENCE CONFIGURATION

Translate project facts into an equipment list.

This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.

System blockTypical scopeConfiguration basis
Gas preparationPousyè, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
STAGE-GATED DECISION PATH

Advance the project only when the required evidence is available.

Each gate turns customer information into a defined technical or commercial output for the next decision.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

OutputMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

OutputVerified preliminary heat balance
03

Utility design

Define boiler, dlo, condensate, header and emissions interfaces.

OutputConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

OutputMeasurable project acceptance sheet
PROJECT FAQ

Questions to resolve before configuration.

Answers define the engineering boundary; they do not replace representative material testing or local compliance review.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, combustion, boiler, tretman dlo, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

PROJECT ENGINEERING REVIEW

Define the material before selecting the equipment.

Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.

Kòmanse Revizyon Pwojè
BAZ ENJINI ALIYEN AK KATALOG

Karbonizasyon ak rezèv vapè fatra-chalè

Konfigure liy karbonizasyon an ak resevwa chaj vapè nan yon sèl mezire chalè ak balans mas.

01

Materyèl k ap rantre

Byomass prepare plis pwofil manje èdtan / chak jou ak spesifikasyon kabòn sib.

02

Pwodiksyon espere

Biochar ak yon kouran dechè-chalè kalifye pou yon devwa vapè dakò.

03

Entèfas pwojè

Manje siye, gaz karbonizasyon, combustion, chodyè fatra-chalè, tretman dlo, presyon vapè / chaj ak kontwòl opere.

MODÈL AK DIMENSITÉ ANREJIST

Sèvi ak sèlman ranje ki matche ak fwontyè pwosesis chwazi a.

Referans katalògKapasitePouvwaAnvlòp fizikEnkli fwontyè
SXTD820Karbonizasyon kontinyèl1-2 m³/h95 kW600 m² katalòg tè referansPrepare byomass liy karbonizasyon kontinyèl
SXTD1200Karbonizasyon kontinyèl3-5 m³/h110 kW650 m² katalòg tè referansPrepare byomass liy karbonizasyon kontinyèl
SXTD1500Karbonizasyon kontinyèl5-8 m³/h153 kW800 m² katalòg tè referansPrepare byomass liy karbonizasyon kontinyèl
SXTD1800Karbonizasyon kontinyèl8-10 m³/h178 kW800 m² katalòg tè referansPrepare byomass liy karbonizasyon kontinyèl
SXTD2000 - 10–14 klasKarbonizasyon kontinyèl10-14 m³/h190 kW850 m² katalòg tè referansKatalòg enprime SXTD2000 pou klas sa a
SXTD2000 - 14–17 klasKarbonizasyon kontinyèl14-17 m³/h220 kW850 m² katalòg tè referansKatalòg repete SXTD2000; kòd modèl final la mande pou yon konfimasyon alekri

Règ konfigirasyon: kapasite katalòg se yon referans planifikasyon. Debi ki estab, pouvwa enstale / opere, anprint, rekiperasyon, pite, emisyon ak demann sèvis piblik mande pou lis ekipman apwouve a, materyèl reprezantan ak kondisyon akseptasyon ekri.

Enfòmasyon ki nesesè anvan konfigirasyon ak sitasyon

  1. Foto materyèl reprezantan, espesifikasyon ak echantiyon ki disponib.
  2. Kapasite obligatwa plis èdtan pou chak chanjman, orè pou chak jou ak jou fonksyònman.
  3. Sib rezilta yo, metòd echantiyon ak kondisyon reseptè en.
  4. Peyi sit la, pouvwa ki disponib, gaz, dlo, lè konprese ak limit bilding yo.
  5. Anviwònman lokal yo, dife, depo ak kondisyon sekirite nan travay.
  6. Limit livrezon yo mande: ekipman, layout, enstalasyon, komisyonin ak fòmasyon.