Наладзьце вытворчасць вугляроду, ачыстка тэхналагічнага газу, абавязак катла і паравая нагрузка кліента як злучаная сістэма.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Бесперапынная карбанізацыя
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.

ЭТАЛЕННАЯ КАНФІГУРАЦЫЯ

Перавядзіце факты праекта ў спіс абсталявання.

Гэтая эталонная матрыца паказвае логіку рашэння. Канчатковыя колькасці, мадэлі і інтэрфейсы належаць да зацверджанай праектнай прапановы.

Сістэмны блокТыпавая сфера прымяненняАснова канфігурацыі
Gas preparationПыл, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
СТАДЫЙНЫ ШЛЯХ РАШЭННЯ

Прасоўвайце праект толькі пры наяўнасці неабходных доказаў.

Кожная брама ператварае інфармацыю аб кліенце ў пэўны тэхнічны або камерцыйны вынік для наступнага рашэння.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

ВыхадMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

ВыхадVerified preliminary heat balance
03

Utility design

Define boiler, вады, condensate, header and emissions interfaces.

ВыхадConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

ВыхадMeasurable project acceptance sheet
ПРАЕКТ FAQ

Пытанні, якія трэба вырашыць перад канфігурацыяй.

Адказы вызначаюць інжынерную мяжу; яны не замяняюць рэпрэзентатыўнае тэсціраванне матэрыялу або мясцовы агляд адпаведнасці.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, гарэнне, boiler, ачыстка вады, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

ТЭХНІЧНЫ АГЛЯД ПРАЕКТА

Перад выбарам абсталявання вызначыцеся з матэрыялам.

Падзяліцеся рэпрэзентатыўным апісаннем матэрыялу, даступны аб'ём, статус сайта і мэтавыя вынікі. YUSHUNXIN будзе выкарыстоўваць гэтыя факты для падрыхтоўкі адпаведнага абмеркавання межаў працэсу і канфігурацыі.

Пачаць агляд праекта
КАТАЛОГІЧНАЯ ІНЖЭНЕРНАЯ БАЗА

Карбанізацыя з падачай пара ад адыходнага цяпла

Канфігурацыя лініі карбанізацыі і атрымання паравой нагрузкі з аднаго вымеранага цепла-масавага балансу.

01

Паступаючы матэрыял

Падрыхтаваная біямаса плюс пагадзінны/сутачны профіль падачы і мэтавая спецыфікацыя вугляроду.

02

Чаканыя вынікі

Біявугаль і кваліфікаваны паток адходнага цяпла для ўзгодненай пары.

03

Інтэрфейсы праекта

Сушка кармоў, газ карбанізацыі, гарэнне, кацёл-утылізатар, ачыстка вады, ціск пары/нагрузка і кіраванне працай.

МАДЭЛЬ І АБ'ЯМ РЭГІСТРА

Выкарыстоўвайце толькі радок, які адпавядае абранай мяжы працэсу.

Спасылка на каталогЁмістасцьМагутнасцьФізічны канвертУключана мяжа
SXTD820Бесперапынная карбанізацыя1–2 м³/г95 кВт600 м² каталог зямельнай даведкіПадрыхтаваная лінія бесперапыннай карбанізацыі біямасы
SXTD1200Бесперапынная карбанізацыя3–5 м³/г110 кВт650 м² каталог зямельнай даведкіПадрыхтаваная лінія бесперапыннай карбанізацыі біямасы
SXTD1500Бесперапынная карбанізацыя5–8 м³/г153 кВт800 м² каталог зямельнай даведкіПадрыхтаваная лінія бесперапыннай карбанізацыі біямасы
SXTD1800Бесперапынная карбанізацыя8–10 м³/г178 кВт800 м² каталог зямельнай даведкіПадрыхтаваная лінія бесперапыннай карбанізацыі біямасы
SXTD2000 - 10–14 класБесперапынная карбанізацыя10–14 м³/г190 кВт850 м² каталог зямельнай даведкіКаталог друку SXTD2000 для гэтага класа
SXTD2000 - 14–17 класБесперапынная карбанізацыя14–17 м³/г220 кВт850 м² каталог зямельнай даведкіКаталог паўтарае SXTD2000; канчатковы код мадэлі патрабуе пісьмовага пацверджання

Правіла канфігурацыі: ёмістасць каталога з'яўляецца арыенцірам планавання. Стабільная прапускная здольнасць, усталяваная/працоўная магутнасць, след, аднаўленне, чысціня, выкіды і камунальныя паслугі патрабуюць зацверджанага спісу абсталявання, рэпрэзентатыўны матэрыял і пісьмовыя ўмовы прыёмкі.

Неабходная інфармацыя перад канфігурацыяй і прапановай

  1. Рэпрэзентатыўныя матэрыяльныя фатаграфіі, спецыфікацыі і даступны ўзор.
  2. Неабходная магутнасць плюс гадзіны за змену, змены ў суткі і працоўныя дні.
  3. Мэтавыя выхады, патрабаванні да метаду выбаркі і прымача ўнізе.
  4. Краіна сайта, даступная магутнасць, паліва, вады, сціснутае паветра і будаўнічыя межы.
  5. Мясцовы экалагічны, агонь, патрабаванні да захоўвання і аховы працы.
  6. Запытаная мяжа дастаўкі: абсталяванне, макет, ўстаноўка, увод у эксплуатацыю і навучанне.