Karbon üretimini yapılandırma, proses gazı arıtma, bağlantılı bir sistem olarak kazan görevi ve müşteri buhar yükü.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Sürekli karbonizasyon
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, basınç, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, basınç, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / KABUL ESASLARI

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, Bakım, low-gas operation and backup-steam behavior for the receiving plant.

REFERANS YAPILANDIRMASI

Proje gerçeklerini ekipman listesine çevirin.

Bu referans matrisi karar mantığını gösterir. Nihai miktarlar, modeller ve arayüzler onaylanmış proje teklifine aittir.

Sistem bloğuTipik kapsamYapılandırma temeli
Gas preparationToz, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
AŞAMA KAPILI KARAR YOLU

Projeyi yalnızca gerekli kanıtlar mevcut olduğunda ilerletin.

Her kapı, müşteri bilgilerini bir sonraki karar için tanımlanmış bir teknik veya ticari çıktıya dönüştürür.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

ÇıkışMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

ÇıkışVerified preliminary heat balance
03

Utility design

Define boiler, su, condensate, header and emissions interfaces.

ÇıkışConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

ÇıkışMeasurable project acceptance sheet
PROJE SSS

Yapılandırmadan önce çözülmesi gereken sorular.

Cevaplar mühendislik sınırlarını tanımlar; temsili malzeme testinin veya yerel uyumluluk incelemesinin yerini almazlar.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, basınç, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, yanma, boiler, su arıtma, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

PROJE MÜHENDİSLİĞİ İNCELEMESİ

Ekipmanı seçmeden önce malzemeyi tanımlayın.

Temsili bir malzeme açıklaması paylaşın, mevcut hacim, site durumu ve hedef çıktılar. YUSHUNXIN, ilgili süreç sınırlarını ve konfigürasyon tartışmasını hazırlamak için bu gerçekleri kullanacaktır..

Proje İncelemesini Başlat
KATALOĞA UYGUN MÜHENDİSLİK ESASLARI

Atık ısı buhar beslemesi ile karbonizasyon

Karbonizasyon hattını yapılandırın ve ölçülen tek bir ısı ve kütle dengesinden buhar yükünü alın.

01

Gelen malzeme

Hazırlanan biyokütle artı saatlik/günlük besleme profili ve hedef karbon spesifikasyonu.

02

Beklenen çıktılar

Kararlaştırılan bir buhar görevi için Biochar ve nitelikli bir atık ısı akışı.

03

Proje arayüzleri

Yem kurutma, karbonizasyon gazı, yanma, atık ısı kazanı, su arıtma, buhar basıncı/yük ve çalışma kontrolü.

MODEL VE ​​KAPSAM KAYDI

Yalnızca seçilen süreç sınırıyla eşleşen satırı kullan.

Katalog referansıKapasiteGüçFiziksel zarfDahil edilen sınır
SXTD820Sürekli karbonizasyon1–2 m³/saat95 kW600 m² katalog arazi referansıHazırlanan biyokütle sürekli karbonizasyon hattı
SXTD1200Sürekli karbonizasyon3–5 m³/saat110 kW650 m² katalog arazi referansıHazırlanan biyokütle sürekli karbonizasyon hattı
SXTD1500Sürekli karbonizasyon5–8 m³/saat153 kW800 m² katalog arazi referansıHazırlanan biyokütle sürekli karbonizasyon hattı
SXTD1800Sürekli karbonizasyon8–10 m³/saat178 kW800 m² katalog arazi referansıHazırlanan biyokütle sürekli karbonizasyon hattı
SXTD2000 - 10–14 sınıfıSürekli karbonizasyon10–14 m³/saat190 kW850 m² katalog arazi referansıKatalog bu sınıf için SXTD2000'i yazdırır
SXTD2000 - 14–17 sınıfıSürekli karbonizasyon14–17 m³/saat220 kW850 m² katalog arazi referansıKatalog SXTD2000'i tekrarlıyor; son model kodu yazılı onay gerektirir

Yapılandırma kuralı: Katalog kapasitesi bir planlama referansıdır. Kararlı verim, kurulu/işletme gücü, ayak izi, iyileşmek, saflık, emisyonlar ve kullanım talebi onaylı ekipman listesini gerektirir, temsili malzeme ve yazılı kabul koşulları.

Yapılandırma ve teklif öncesinde gerekli bilgiler

  1. Temsili malzeme fotoğrafları, özellikler ve mevcut örnek.
  2. Gerekli kapasite artı vardiya başına saat, günlük vardiyalar ve çalışma günleri.
  3. Hedef çıktılar, örnekleme yöntemi ve aşağı akış alıcı gereksinimleri.
  4. Site ülkesi, mevcut güç, yakıt, su, basınçlı hava ve bina sınırları.
  5. Yerel çevre, ateş, depolama ve iş güvenliği gereklilikleri.
  6. İstenen teslimat sınırı: teçhizat, düzen, kurulum, devreye alma ve eğitim.