Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Continuous carbonization
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / DASAR PENERIMAAN

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.

KONFIGURASI REFERENSI

Terjemahkan fakta proyek ke dalam daftar peralatan.

Matriks referensi ini menunjukkan logika keputusan. Jumlah akhir, model dan antarmuka termasuk dalam proposal proyek yang disetujui.

Blok sistemRuang lingkup yang khasDasar konfigurasi
Gas preparationDebu, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
JALUR KEPUTUSAN BERPENGALAMAN TAHAP

Lanjutkan proyek hanya jika bukti yang diperlukan tersedia.

Setiap gerbang mengubah informasi pelanggan menjadi keluaran teknis atau komersial tertentu untuk keputusan berikutnya.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

KeluaranMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

KeluaranVerified preliminary heat balance
03

Utility design

Define boiler, air, condensate, header and emissions interfaces.

KeluaranConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

KeluaranMeasurable project acceptance sheet
FAQ PROYEK

Pertanyaan yang harus diselesaikan sebelum konfigurasi.

Jawaban menentukan batas teknik; hal ini tidak menggantikan pengujian material yang representatif atau tinjauan kepatuhan lokal.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

TINJAUAN TEKNIK PROYEK

Tentukan bahan sebelum memilih peralatan.

Bagikan deskripsi materi yang representatif, volume yang tersedia, status situs dan keluaran target. YUSHUNXIN akan menggunakan fakta-fakta tersebut untuk mempersiapkan batasan proses dan diskusi konfigurasi yang relevan.

Mulai Tinjauan Proyek
DASAR TEKNIK YANG DISELASKAN KATALOG

Carbonization with waste-heat steam supply

Configure the carbonization line and receiving steam load from one measured heat and mass balance.

01

Materi masuk

Prepared biomass plus hourly/daily feed profile and target carbon specification.

02

Output yang diharapkan

Biochar and a qualified waste-heat stream for an agreed steam duty.

03

Antarmuka proyek

Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.

DAFTAR MODEL DAN RUANG LINGKUP

Gunakan hanya baris yang cocok dengan batas proses yang dipilih.

Referensi katalogKapasitasKekuatanAmplop fisikTermasuk batas
SXTD820Continuous carbonization1–2 m³/h95 kW600 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1200Continuous carbonization3–5 m³/h110 kW650 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1500Continuous carbonization5–8 m³/h153 kW800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1800Continuous carbonization8–10 m³/h178 kW800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD2000 - 10–14 classContinuous carbonization10–14 m³/h190 kW850 m² catalogue land referenceCatalogue prints SXTD2000 for this class
SXTD2000 - 14–17 classContinuous carbonization14–17 m³/h220 kW850 m² catalogue land referenceCatalogue repeats SXTD2000; final model code requires written confirmation

Aturan konfigurasi: kapasitas katalog merupakan acuan perencanaan. Throughput yang stabil, daya terpasang/pengoperasian, tapak, pemulihan, kemurnian, emisi dan permintaan utilitas memerlukan daftar peralatan yang disetujui, syarat penerimaan materi dan tertulis yang representatif.

Informasi diperlukan sebelum konfigurasi dan kutipan

  1. Foto materi yang representatif, spesifikasi dan sampel yang tersedia.
  2. Kapasitas yang dibutuhkan ditambah jam kerja per shift, shift per hari dan hari operasional.
  3. Menargetkan keluaran, metode pengambilan sampel dan persyaratan penerima hilir.
  4. Negara situs, daya yang tersedia, bahan bakar, air, udara bertekanan dan batas bangunan.
  5. Lingkungan setempat, api, persyaratan penyimpanan dan keselamatan kerja.
  6. Batas pengiriman yang diminta: peralatan, tata letak, instalasi, komisioning dan pelatihan.