Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.
Turn stable carbonization heat into useful industrial steam.
A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Keep carbon quality and steam reliability under separate control
The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.
- 01Biomass drying and feeding
- 02Continuous carbonization
- 03Dust and condensable separation
- 04Gas cleaning and controlled combustion
- 05Steam generation and water treatment
- 06Distribution, metering and backup supply
Define the user before defining the boiler
Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.
Steam demand
Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.
Water system
Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.
Fuel stability
Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.
Interface boundary
Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.
Verify both carbon output and usable steam
Acceptance should be based on documented feedstock, operating conditions and measurement methods.
Carbon product
Record yield and product properties only against the tested biomass and agreed thermal program.
Steam output
Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.
Emissions boundary
Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.
Continuity plan
Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.
См. границу подключенного оборудования.
Справочные визуальные элементы поддерживают обсуждение макета на ранних стадиях.. Окончательное оборудование, расположение и интерфейсы подтверждены из материалов проекта и сайта.
Преобразование фактов проекта в список оборудования.
Эта справочная матрица показывает логику принятия решений.. Окончательное количество, модели и интерфейсы входят в утвержденное проектное предложение.
| Системный блок | Типичный объем | Основа конфигурации |
|---|---|---|
| Gas preparation | Пыль, condensable and moisture control with safe buffering | Carbonization-gas variability and burner limits |
| Combustion system | Controlled burner, combustion chamber and safety interlocks | Steam duty, turndown and supplementary-fuel plan |
| Boiler island | Boiler, economizer, blowdown, instruments and protection | Pressure, temperature and operating code basis |
| Water and condensate | Treatment, deaeration, make-up water and condensate return | Source-water quality and user return conditions |
| Steam delivery | Header, metering, pressure control and backup interface | Minimum, normal and peak customer demand |
Продвигайте проект только тогда, когда доступны необходимые доказательства..
Каждый шлюз превращает информацию о клиенте в определенный технический или коммерческий результат для принятия следующего решения..
Load profile
Capture minimum, normal and peak demand plus continuity requirements.
ВыходMetered or documented steam-demand basisEnergy balance
Match process-gas availability, internal heat demand and backup fuel.
ВыходVerified preliminary heat balanceUtility design
Define boiler, вода, condensate, header and emissions interfaces.
ВыходConnected utility configurationAcceptance plan
Agree test feedstock, stable window, meters and backup behavior.
ВыходMeasurable project acceptance sheetВопросы, которые необходимо решить перед настройкой.
Ответы определяют инженерные границы; они не заменяют репрезентативные испытания материалов или проверку соответствия на местном уровне..
What information is needed from the steam user?
Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.
Can process gas alone guarantee continuous steam supply?
Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.
What belongs in the steam-system boundary?
The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.
How should steam acceptance be measured?
Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.
Определите материал перед выбором оборудования.
Поделитесь репрезентативным описанием материала, доступный объем, статус объекта и целевые результаты. YUSHUNXIN будет использовать эти факты для подготовки обсуждения соответствующих границ процесса и конфигурации..
Carbonization with waste-heat steam supply
Configure the carbonization line and receiving steam load from one measured heat and mass balance.
Входящий материал
Prepared biomass plus hourly/daily feed profile and target carbon specification.
Ожидаемые результаты
Biochar and a qualified waste-heat stream for an agreed steam duty.
Интерфейсы проекта
Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.
Используйте только строку, соответствующую выбранной границе процесса..
| Ссылка на каталог | Емкость | Власть | Физическая оболочка | Включенная граница |
|---|---|---|---|---|
| SXTD820Continuous carbonization | 1–2 m³/h | 95 кВт | 600 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1200Continuous carbonization | 3–5 m³/h | 110 кВт | 650 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1500Continuous carbonization | 5–8 m³/h | 153 кВт | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1800Continuous carbonization | 8–10 m³/h | 178 кВт | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD2000 - 10–14 classContinuous carbonization | 10–14 m³/h | 190 кВт | 850 m² catalogue land reference | Catalogue prints SXTD2000 for this class |
| SXTD2000 - 14–17 classContinuous carbonization | 14–17 m³/h | 220 кВт | 850 m² catalogue land reference | Catalogue repeats SXTD2000; final model code requires written confirmation |
Правило конфигурации: емкость каталога является ориентиром для планирования. Стабильная пропускная способность, установленная/рабочая мощность, след, восстановление, чистота, выбросы и спрос на коммунальные услуги требуют утвержденного списка оборудования, репрезентативный материал и письменные условия приемки.
Информация, необходимая перед конфигурацией и предложением
- Репрезентативные фотографии материалов, Технические характеристики и доступный образец.
- Требуемая мощность плюс часы в смену, смен в день и рабочие дни.
- Целевые результаты, метод отбора проб и требования к приемнику ниже по потоку.
- Страна сайта, доступная мощность, топливо, вода, сжатый воздух и ограничения здания.
- Местная экология, огонь, требования к хранению и охране труда.
- Запрошенная граница доставки: оборудование, макет, установка, ввод в эксплуатацию и обучение.