Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Continuous carbonization
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, ukugcinwa, low-gas operation and backup-steam behavior for the receiving plant.

UKULUNGISWA KWEREferensi

Humusha amaqiniso ephrojekthi ohlwini lwemishini.

Le matrix yesithenjwa ibonisa ingqondo yesinqumo. Amanani okugcina, amamodeli nokuxhumana kuyingxenye yesiphakamiso sephrojekthi esigunyaziwe.

Ibhulokhi yesistimuUbubanzi obujwayelekileIsisekelo sokucushwa
Gas preparationUthuli, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
INDLELA YESINQUMO ESEsiteji

Thuthukisa iphrojekthi kuphela lapho ubufakazi obudingekayo butholakala.

Isango ngalinye liphendula imininingwane yekhasimende ibe okokuphumayo okuchaziwe kwezobuchwepheshe noma kwezohwebo ukuze kuthathwe isinqumo esilandelayo.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

OkukhiphayoMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

OkukhiphayoVerified preliminary heat balance
03

Utility design

Define boiler, amanzi, condensate, header and emissions interfaces.

OkukhiphayoConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

OkukhiphayoMeasurable project acceptance sheet
PROJECT FAQ

Imibuzo okufanele ixazululwe ngaphambi kokucushwa.

Izimpendulo zichaza umngcele wobunjiniyela; azithathi indawo yokuhlolwa kwezinto ezimele noma ukubuyekezwa kokuthobelana kwendawo.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

UKUBUYEKEZWA KOBUNJININANI BEPROJEKTHI

Chaza impahla ngaphambi kokukhetha okokusebenza.

Yabelana ngencazelo yezinto ezimele, ivolumu etholakalayo, isimo sesayithi kanye nemiphumela eqondiwe. I-YUSHUNXIN izosebenzisa lawo maqiniso ukulungiselela umngcele wenqubo efanele kanye nengxoxo yokumisa.

Qala Ukubuyekezwa Kwephrojekthi
IMISEKELO YOBUNJINENI EHLANGANISIWE IKHATHALOGUE

Carbonization with waste-heat steam supply

Configure the carbonization line and receiving steam load from one measured heat and mass balance.

01

Izinto ezingenayo

Prepared biomass plus hourly/daily feed profile and target carbon specification.

02

Imiphumela elindelwe

Biochar and a qualified waste-heat stream for an agreed steam duty.

03

Izixhumanisi zephrojekthi

Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.

I-MODEL NE-SCOPE REGISTER

Sebenzisa kuphela irowu ehambisana nomngcele wenqubo ekhethiwe.

Ireferensi yekhathalogiAmandlaAmandlaImvilophu ebonakalayoUmngcele ofakiwe
SXTD820Continuous carbonization1–2 m³/h95 kW600 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1200Continuous carbonization3–5 m³/h110 kW650 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1500Continuous carbonization5–8 m³/h153 kW800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1800Continuous carbonization8–10 m³/h178 kW800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD2000 - 10–14 classContinuous carbonization10–14 m³/h190 kW850 m² catalogue land referenceCatalogue prints SXTD2000 for this class
SXTD2000 - 14–17 classContinuous carbonization14–17 m³/h220 kW850 m² catalogue land referenceCatalogue repeats SXTD2000; final model code requires written confirmation

Umthetho wokumisa: umthamo wekhathalogi iyireferensi yokuhlela. Ukusebenza okuzinzile, amandla afakiwe/okusebenza, umkhondo, ukululama, ubumsulwa, ukukhishwa kwekhabhoni kanye nesidingo sokusetshenziswa kudinga uhlu lwempahla egunyaziwe, izinto ezimele kanye nezimo zokwamukelwa ezibhalwe phansi.

Ulwazi oludingekayo ngaphambi kokucushwa kanye nekhotheshini

  1. Izithombe zezinto ezibonakalayo, imininingwane kanye nesampula etholakalayo.
  2. Umthamo odingekayo kanye namahora shift ngayinye, amashifu ngosuku nezinsuku zokusebenza.
  3. Okuphumayo okuqondiwe, indlela yamasampula kanye nezidingo zomamukeli ongezansi.
  4. Izwe lesayithi, amandla atholakalayo, amafutha, amanzi, umoya ocindezelwe kanye nemingcele yokwakha.
  5. Imvelo yendawo, umlilo, isitoreji kanye nezidingo zokuphepha emsebenzini.
  6. Ucele umngcele wokulethwa: imishini, isakhiwo, ukufakwa, ukuthunywa nokuqeqeshwa.