Konfigurēt oglekļa ražošanu, process-gāzes apstrāde, katla pienākums un klienta tvaika slodze kā savienota sistēma.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Nepārtraukta karbonizācija
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.

REFERENCE CONFIGURATION

Translate project facts into an equipment list.

This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.

System blockTypical scopeConfiguration basis
Gas preparationPutekļi, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
STAGE-GATED DECISION PATH

Advance the project only when the required evidence is available.

Each gate turns customer information into a defined technical or commercial output for the next decision.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

IzvadeMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

IzvadeVerified preliminary heat balance
03

Utility design

Define boiler, ūdens, condensate, header and emissions interfaces.

IzvadeConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

IzvadeMeasurable project acceptance sheet
PROJECT FAQ

Questions to resolve before configuration.

Answers define the engineering boundary; they do not replace representative material testing or local compliance review.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, degšana, boiler, ūdens apstrāde, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

PROJECT ENGINEERING REVIEW

Define the material before selecting the equipment.

Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.

Sāciet projekta pārskatīšanu
UZ KATALOGU SASKAŅOTĀS INŽENĒRIJAS BĀZE

Karbonizācija ar siltuma tvaika padevi

Konfigurējiet karbonizācijas līniju un tvaika slodzes saņemšanu no viena izmērītā siltuma un masas bilances.

01

Ienākošais materiāls

Sagatavots biomasas plus stundas/dienas barības profils un mērķa oglekļa specifikācija.

02

Paredzamie rezultāti

Bioogle un kvalificēta atkrituma siltuma plūsma par saskaņotu tvaika nodevu.

03

Projektu saskarnes

Barības žāvēšana, karbonizācijas gāze, degšana, siltuma katls, ūdens apstrāde, tvaika spiediens/slodze un darbības kontrole.

MODEĻU UN APJOMAS REĢISTRS

Izmantojiet tikai rindu, kas atbilst atlasītajai procesa robežai.

Kataloga atsauceJaudaJaudaFiziskā aploksneIekļautā robeža
SXTD820Nepārtraukta karbonizācija1-2 m³/h95 kW600 m² kataloga zemes atsauceSagatavota biomasas nepārtrauktās karbonizācijas līnija
SXTD1200Nepārtraukta karbonizācija3-5 m³/h110 kW650 m² kataloga zemes atsauceSagatavota biomasas nepārtrauktās karbonizācijas līnija
SXTD1500Nepārtraukta karbonizācija5-8 m³/h153 kW800 m² kataloga zemes atsauceSagatavota biomasas nepārtrauktās karbonizācijas līnija
SXTD1800Nepārtraukta karbonizācija8-10 m³/h178 kW800 m² kataloga zemes atsauceSagatavota biomasas nepārtrauktās karbonizācijas līnija
SXTD2000 - 10-14 klaseNepārtraukta karbonizācija10-14 m³/h190 kW850 m² kataloga zemes atsauceKatalogs izdrukā SXTD2000 šai klasei
SXTD2000 - 14-17 klaseNepārtraukta karbonizācija14-17 m³/h220 kW850 m² kataloga zemes atsauceKatalogs atkārto SXTD2000; gala modeļa kodam nepieciešams rakstisks apstiprinājums

Konfigurācijas noteikums: kataloga ietilpība ir plānošanas atsauce. Stabila caurlaidspēja, uzstādītā/darba jauda, pēdas nospiedums, atveseļošanās, tīrība, emisijām un komunālo pakalpojumu pieprasījumam ir nepieciešams apstiprināto iekārtu saraksts, reprezentatīvie materiālie un rakstiskie pieņemšanas nosacījumi.

Nepieciešamā informācija pirms konfigurēšanas un piedāvājuma

  1. Reprezentatīvās materiālu fotogrāfijas, specifikācijas un pieejamais paraugs.
  2. Nepieciešamā kapacitāte plus stundas maiņā, maiņas dienā un darba dienās.
  3. Mērķa izvadi, paraugu ņemšanas metode un pakārtotā uztvērēja prasības.
  4. Vietnes valsts, pieejamā jauda, degviela, ūdens, saspiestais gaiss un ēkas ierobežojumi.
  5. Vietējā vide, uguns, uzglabāšanas un darba drošības prasības.
  6. Pieprasītā piegādes robeža: iekārtas, izkārtojumu, uzstādīšana, nodošana ekspluatācijā un apmācība.