Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.
Turn stable carbonization heat into useful industrial steam.
A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Keep carbon quality and steam reliability under separate control
The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.
- 01Biomass drying and feeding
- 02Үздіксіз карбонизация
- 03Dust and condensable separation
- 04Gas cleaning and controlled combustion
- 05Steam generation and water treatment
- 06Distribution, metering and backup supply
Define the user before defining the boiler
Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.
Steam demand
Provide minimum, normal and peak demand, жұмыс уақыты, pressure, temperature and seasonal production schedule.
Water system
Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.
Fuel stability
Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.
Interface boundary
Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.
Verify both carbon output and usable steam
Acceptance should be based on documented feedstock, operating conditions and measurement methods.
Carbon product
Record yield and product properties only against the tested biomass and agreed thermal program.
Steam output
Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.
Emissions boundary
Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.
Continuity plan
Define startup, shutdown, техникалық қызмет көрсету, low-gas operation and backup-steam behavior for the receiving plant.
Жалғанған жабдық шекарасын қараңыз.
Анықтамалық көрнекіліктер орналасуды ертерек талқылауды қолдайды. Соңғы жабдық, орналасуы мен интерфейстері жоба материалы мен сайтынан расталады.
Жоба фактілерін жабдық тізіміне аударыңыз.
Бұл анықтамалық матрица шешім логикасын көрсетеді. Соңғы шамалар, модельдер мен интерфейстер бекітілген жоба ұсынысына жатады.
| Жүйелік блок | Типтік ауқым | Конфигурация негізі |
|---|---|---|
| Gas preparation | Шаң, condensable and moisture control with safe buffering | Carbonization-gas variability and burner limits |
| Combustion system | Controlled burner, combustion chamber and safety interlocks | Steam duty, turndown and supplementary-fuel plan |
| Boiler island | Boiler, economizer, blowdown, instruments and protection | Pressure, temperature and operating code basis |
| Water and condensate | Treatment, deaeration, make-up water and condensate return | Source-water quality and user return conditions |
| Steam delivery | Header, metering, pressure control and backup interface | Minimum, normal and peak customer demand |
Қажетті дәлелдер болған кезде ғана жобаны алға жылжытыңыз.
Әрбір қақпа тұтынушы туралы ақпаратты келесі шешім үшін анықталған техникалық немесе коммерциялық нәтижеге айналдырады.
Load profile
Capture minimum, normal and peak demand plus continuity requirements.
ШығаруMetered or documented steam-demand basisEnergy balance
Match process-gas availability, internal heat demand and backup fuel.
ШығаруVerified preliminary heat balanceUtility design
Define boiler, су, condensate, header and emissions interfaces.
ШығаруConnected utility configurationAcceptance plan
Agree test feedstock, stable window, meters and backup behavior.
ШығаруMeasurable project acceptance sheetКонфигурациядан бұрын шешілетін сұрақтар.
Жауаптар инженерлік шекараны анықтайды; олар репрезентативті материалды сынауды немесе жергілікті сәйкестікті тексеруді алмастырмайды.
What information is needed from the steam user?
Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.
Can process gas alone guarantee continuous steam supply?
Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.
What belongs in the steam-system boundary?
The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.
How should steam acceptance be measured?
Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.
Define the material before selecting the equipment.
Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.
Carbonization with waste-heat steam supply
Configure the carbonization line and receiving steam load from one measured heat and mass balance.
Кіріс материал
Prepared biomass plus hourly/daily feed profile and target carbon specification.
Күтілетін нәтижелер
Biochar and a qualified waste-heat stream for an agreed steam duty.
Жоба интерфейстері
Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.
Таңдалған процесс шекарасына сәйкес келетін жолды ғана пайдаланыңыз.
| Каталог анықтамасы | Сыйымдылығы | Қуат | Физикалық конверт | Қосылған шекара |
|---|---|---|---|---|
| SXTD820Үздіксіз карбонизация | 1–2 м³/сағ | 95 кВт | 600 м² каталог бойынша жер анықтамасы | Биомассаны үздіксіз карбонизациялау желісі дайындалды |
| SXTD1200Үздіксіз карбонизация | 3–5 м³/сағ | 110 кВт | 650 м² каталог бойынша жер анықтамасы | Биомассаны үздіксіз карбонизациялау желісі дайындалды |
| SXTD1500Үздіксіз карбонизация | 5–8 м³/сағ | 153 кВт | 800 м² каталог бойынша жер анықтамасы | Биомассаны үздіксіз карбонизациялау желісі дайындалды |
| SXTD1800Үздіксіз карбонизация | 8–10 м³/сағ | 178 кВт | 800 м² каталог бойынша жер анықтамасы | Биомассаны үздіксіз карбонизациялау желісі дайындалды |
| SXTD2000 - 10– 14 сыныпҮздіксіз карбонизация | 10–14 м³/сағ | 190 кВт | 850 м² каталог бойынша жер анықтамасы | Каталог осы сынып үшін SXTD2000 басып шығарады |
| SXTD2000 - 14– 17 сыныпҮздіксіз карбонизация | 14–17 м³/сағ | 220 кВт | 850 м² каталог бойынша жер анықтамасы | Каталог SXTD2000 қайталанады; соңғы үлгі коды жазбаша растауды қажет етеді |
Конфигурация ережесі: каталог сыйымдылығы жоспарлау анықтамасы болып табылады. Тұрақты өткізу қабілеті, орнатылған/жұмыс қуаты, ізі, қалпына келтіру, тазалық, шығарындылар мен коммуналдық қызметтерге сұраныс бекітілген жабдық тізімін қажет етеді, репрезентативті материал және жазбаша қабылдау шарттары.
Конфигурация мен баға белгілеу алдында қажет ақпарат
- Өкілдік материал фотосуреттері, техникалық сипаттамалар және қол жетімді үлгі.
- Қажетті өнімділік плюс ауысымдағы сағаттар, тәулігіне ауысым және жұмыс күндері.
- Мақсатты нәтижелер, сынама алу әдісі және төменгі ағынды қабылдағышқа қойылатын талаптар.
- Сайт елі, қол жетімді қуат, жанармай, су, сығылған ауа және құрылыс шектеулері.
- Жергілікті қоршаған орта, өрт, сақтау және еңбекті қорғау талаптары.
- Сұралған жеткізу шекарасы: жабдық, макет, орнату, пайдалануға беру және оқыту.