Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Үздіксіз карбонизация
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, жұмыс уақыты, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, техникалық қызмет көрсету, low-gas operation and backup-steam behavior for the receiving plant.

АНЫҚТАМА КОНФИГУРАЦИЯСЫ

Жоба фактілерін жабдық тізіміне аударыңыз.

Бұл анықтамалық матрица шешім логикасын көрсетеді. Соңғы шамалар, модельдер мен интерфейстер бекітілген жоба ұсынысына жатады.

Жүйелік блокТиптік ауқымКонфигурация негізі
Gas preparationШаң, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
КЕЗЕҢДІК ШЕШІМДІ ҚАБЫЛДАУ ЖОЛЫ

Қажетті дәлелдер болған кезде ғана жобаны алға жылжытыңыз.

Әрбір қақпа тұтынушы туралы ақпаратты келесі шешім үшін анықталған техникалық немесе коммерциялық нәтижеге айналдырады.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

ШығаруMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

ШығаруVerified preliminary heat balance
03

Utility design

Define boiler, су, condensate, header and emissions interfaces.

ШығаруConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

ШығаруMeasurable project acceptance sheet
ЖОБА ЖОҚ

Конфигурациядан бұрын шешілетін сұрақтар.

Жауаптар инженерлік шекараны анықтайды; олар репрезентативті материалды сынауды немесе жергілікті сәйкестікті тексеруді алмастырмайды.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

PROJECT ENGINEERING REVIEW

Define the material before selecting the equipment.

Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.

Жобаны шолуды бастаңыз
КАТАЛОГТА ТЕГЕН ИНЖЕНЕРЛІК НЕГІЗІ

Carbonization with waste-heat steam supply

Configure the carbonization line and receiving steam load from one measured heat and mass balance.

01

Кіріс материал

Prepared biomass plus hourly/daily feed profile and target carbon specification.

02

Күтілетін нәтижелер

Biochar and a qualified waste-heat stream for an agreed steam duty.

03

Жоба интерфейстері

Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.

МҮЛГІ ЖӘНЕ ҚОЛДАНУ САЛАСЫ ТІЗІМІ

Таңдалған процесс шекарасына сәйкес келетін жолды ғана пайдаланыңыз.

Каталог анықтамасыСыйымдылығыҚуатФизикалық конвертҚосылған шекара
SXTD820Үздіксіз карбонизация1–2 м³/сағ95 кВт600 м² каталог бойынша жер анықтамасыБиомассаны үздіксіз карбонизациялау желісі дайындалды
SXTD1200Үздіксіз карбонизация3–5 м³/сағ110 кВт650 м² каталог бойынша жер анықтамасыБиомассаны үздіксіз карбонизациялау желісі дайындалды
SXTD1500Үздіксіз карбонизация5–8 м³/сағ153 кВт800 м² каталог бойынша жер анықтамасыБиомассаны үздіксіз карбонизациялау желісі дайындалды
SXTD1800Үздіксіз карбонизация8–10 м³/сағ178 кВт800 м² каталог бойынша жер анықтамасыБиомассаны үздіксіз карбонизациялау желісі дайындалды
SXTD2000 - 10– 14 сыныпҮздіксіз карбонизация10–14 м³/сағ190 кВт850 м² каталог бойынша жер анықтамасыКаталог осы сынып үшін SXTD2000 басып шығарады
SXTD2000 - 14– 17 сыныпҮздіксіз карбонизация14–17 м³/сағ220 кВт850 м² каталог бойынша жер анықтамасыКаталог SXTD2000 қайталанады; соңғы үлгі коды жазбаша растауды қажет етеді

Конфигурация ережесі: каталог сыйымдылығы жоспарлау анықтамасы болып табылады. Тұрақты өткізу қабілеті, орнатылған/жұмыс қуаты, ізі, қалпына келтіру, тазалық, шығарындылар мен коммуналдық қызметтерге сұраныс бекітілген жабдық тізімін қажет етеді, репрезентативті материал және жазбаша қабылдау шарттары.

Конфигурация мен баға белгілеу алдында қажет ақпарат

  1. Өкілдік материал фотосуреттері, техникалық сипаттамалар және қол жетімді үлгі.
  2. Қажетті өнімділік плюс ауысымдағы сағаттар, тәулігіне ауысым және жұмыс күндері.
  3. Мақсатты нәтижелер, сынама алу әдісі және төменгі ағынды қабылдағышқа қойылатын талаптар.
  4. Сайт елі, қол жетімді қуат, жанармай, су, сығылған ауа және құрылыс шектеулері.
  5. Жергілікті қоршаған орта, өрт, сақтау және еңбекті қорғау талаптары.
  6. Сұралған жеткізу шекарасы: жабдық, макет, орнату, пайдалануға беру және оқыту.