Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.
Turn stable carbonization heat into useful industrial steam.
A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Keep carbon quality and steam reliability under separate control
The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.
- 01Biomass drying and feeding
- 02Continuous carbonization
- 03Dust and condensable separation
- 04Gas cleaning and controlled combustion
- 05Steam generation and water treatment
- 06Distribution, metering and backup supply
Define the user before defining the boiler
Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.
Steam demand
Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.
Water system
Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.
Fuel stability
Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.
Interface boundary
Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.
Verify both carbon output and usable steam
Acceptance should be based on documented feedstock, operating conditions and measurement methods.
Carbon product
Record yield and product properties only against the tested biomass and agreed thermal program.
Steam output
Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.
Emissions boundary
Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.
Continuity plan
Define startup, shutdown, Ënnerhalt, low-gas operation and backup-steam behavior for the receiving plant.
See the connected equipment boundary.
Reference visuals support early layout discussion. Final equipment, arrangement and interfaces are confirmed from the project material and site.
Iwwersetzen Projet Fakten an eng Equipement Lëscht.
Dës Referenzmatrix weist d'Entscheedungslogik. Finale Quantitéiten, Modeller an Schnëttplazen gehéieren zu der guttgeheescht Projet Propositioun.
| System blockéieren | Typesch Ëmfang | Configuratioun Basis |
|---|---|---|
| Gas preparation | Stëbs, condensable and moisture control with safe buffering | Carbonization-gas variability and burner limits |
| Combustion system | Controlled burner, combustion chamber and safety interlocks | Steam duty, turndown and supplementary-fuel plan |
| Boiler island | Boiler, economizer, blowdown, instruments and protection | Pressure, temperature and operating code basis |
| Water and condensate | Treatment, deaeration, make-up water and condensate return | Source-water quality and user return conditions |
| Steam delivery | Header, metering, pressure control and backup interface | Minimum, normal and peak customer demand |
Gitt de Projet nëmme vir wann déi erfuerderlech Beweiser verfügbar ass.
All Paart verwandelt Clientinformatioun an eng definéiert technesch oder kommerziell Ausgab fir déi nächst Entscheedung.
Load profile
Capture minimum, normal and peak demand plus continuity requirements.
AusgangMetered or documented steam-demand basisEnergy balance
Match process-gas availability, internal heat demand and backup fuel.
AusgangVerified preliminary heat balanceUtility design
Define boiler, Waasser, condensate, header and emissions interfaces.
AusgangConnected utility configurationAcceptance plan
Agree test feedstock, stable window, meters and backup behavior.
AusgangMeasurable project acceptance sheetFroen ze léisen virun der Konfiguratioun.
Äntwerten definéieren d'Ingenieurgrenz; si ersetzen net representativ Materialprüfung oder lokal Konformitéitsiwwerpréiwung.
What information is needed from the steam user?
Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.
Can process gas alone guarantee continuous steam supply?
Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.
What belongs in the steam-system boundary?
The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.
How should steam acceptance be measured?
Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.
Definéiert d'Material ier Dir d'Ausrüstung auswielt.
Deelt eng representativ Materialbeschreiwung, verfügbare Volumen, Site Status an Zilausgaben. YUSHUNXIN wäert dës Fakten benotzen déi relevant Prozess Grenz an Configuratioun Diskussioun ze preparéieren.
Carbonization with waste-heat steam supply
Configure the carbonization line and receiving steam load from one measured heat and mass balance.
Entréeën Material
Prepared biomass plus hourly/daily feed profile and target carbon specification.
Erwaart Ausgänge
Biochar and a qualified waste-heat stream for an agreed steam duty.
Projet Schnëttplazen
Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.
Benotzt nëmmen d'Zeil déi mat der gewielter Prozessgrenz passt.
| Katalog Referenz | Kapazitéit | Muecht | Kierperlech Enveloppe | Included boundary |
|---|---|---|---|---|
| SXTD820Continuous carbonization | 1–2 m³/h | 95 kW | 600 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1200Continuous carbonization | 3–5 m³/h | 110 kW | 650 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1500Continuous carbonization | 5–8 m³/h | 153 kW | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1800Continuous carbonization | 8–10 m³/h | 178 kW | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD2000 - 10–14 classContinuous carbonization | 10–14 m³/h | 190 kW | 850 m² catalogue land reference | Catalogue prints SXTD2000 for this class |
| SXTD2000 - 14–17 classContinuous carbonization | 14–17 m³/h | 220 kW | 850 m² catalogue land reference | Catalogue repeats SXTD2000; final model code requires written confirmation |
Configuration rule: catalogue capacity is a planning reference. Stable throughput, installed/operating power, footprint, recovery, purity, emissions and utility demand require the approved equipment list, representative material and written acceptance conditions.
Information required before configuration and quotation
- Representative material photos, specifications and available sample.
- Required capacity plus hours per shift, shifts per day and operating days.
- Zilausgaben, sampling method and downstream receiver requirements.
- Site country, verfügbare Kraaft, Brennstoff, Waasser, kompriméiert Loft a Gebai Grenzen.
- Lokal Ëmwelt, Feier, Stockage an berufflech-Sécherheet Ufuerderunge.
- Ufro Liwwerung Grenz: Equipement, Layout, Installatioun, Kommissioun an Ausbildung.