Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Continuous carbonization
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, обслуговування, low-gas operation and backup-steam behavior for the receiving plant.

ЕТАЛОННА КОНФІГУРАЦІЯ

Перекладіть факти проекту в список обладнання.

Ця опорна матриця показує логіку прийняття рішення. Кінцеві кількості, моделі та інтерфейси належать до затвердженої проектної пропозиції.

Системний блокТиповий обсягОснова конфігурації
Gas preparationПил, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
ШЛЯХ ПРИЙНЯТТЯ РІШЕНЬ ПОСТАДІВ

Просувайте проект лише за наявності необхідних доказів.

Кожен шлюз перетворює інформацію про клієнта в певний технічний або комерційний результат для наступного рішення.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

ВихідMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

ВихідVerified preliminary heat balance
03

Utility design

Define boiler, води, condensate, header and emissions interfaces.

ВихідConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

ВихідMeasurable project acceptance sheet
FAQ ПРО ПРОЕКТ

Питання, які потрібно вирішити перед налаштуванням.

Відповіді визначають інженерну межу; вони не замінюють репрезентативне випробування матеріалів або місцеву перевірку відповідності.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, горіння, boiler, water treatment, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

ТЕХНІЧНИЙ ОГЛЯД ПРОЕКТУ

Перед вибором обладнання визначте матеріал.

Поділіться характерним описом матеріалу, доступний обсяг, статус сайту та цільові результати. YUSHUNXIN використовуватиме ці факти для підготовки обговорення відповідних меж процесу та конфігурації.

Розпочати перевірку проекту
CATALOGUE-ALIGNED ENGINEERING BASIS

Carbonization with waste-heat steam supply

Configure the carbonization line and receiving steam load from one measured heat and mass balance.

01

Incoming material

Prepared biomass plus hourly/daily feed profile and target carbon specification.

02

Expected outputs

Biochar and a qualified waste-heat stream for an agreed steam duty.

03

Project interfaces

Feed drying, carbonization gas, горіння, waste-heat boiler, water treatment, steam pressure/load and operating control.

MODEL AND SCOPE REGISTER

Use only the row matching the selected process boundary.

Catalogue referenceЄмністьпотужністьPhysical envelopeIncluded boundary
SXTD820Continuous carbonization1–2 m³/h95 кВт600 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1200Continuous carbonization3–5 m³/h110 кВт650 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1500Continuous carbonization5–8 m³/h153 кВт800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1800Continuous carbonization8–10 m³/h178 кВт800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD2000 - 10–14 classContinuous carbonization10–14 m³/h190 кВт850 m² catalogue land referenceCatalogue prints SXTD2000 for this class
SXTD2000 - 14–17 classContinuous carbonization14–17 m³/h220 кВт850 m² catalogue land referenceCatalogue repeats SXTD2000; final model code requires written confirmation

Configuration rule: catalogue capacity is a planning reference. Stable throughput, installed/operating power, footprint, recovery, чистота, emissions and utility demand require the approved equipment list, representative material and written acceptance conditions.

Information required before configuration and quotation

  1. Representative material photos, specifications and available sample.
  2. Required capacity plus hours per shift, shifts per day and operating days.
  3. Цільові результати, sampling method and downstream receiver requirements.
  4. Site country, available power, fuel, води, compressed air and building limits.
  5. Local environmental, fire, storage and occupational-safety requirements.
  6. Requested delivery boundary: обладнання, макет, установка, commissioning and training.