Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Ilọsiwaju carbonization
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.

03 / Ipilẹ gbigba

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.

REFERENCE CONFIGURATION

Translate project facts into an equipment list.

This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.

System blockTypical scopeConfiguration basis
Gas preparationEruku, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, metering, pressure control and backup interfaceMinimum, normal and peak customer demand
STAGE-GATED DECISION PATH

Advance the project only when the required evidence is available.

Each gate turns customer information into a defined technical or commercial output for the next decision.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

OutputMetered or documented steam-demand basis
02

Energy balance

Match process-gas availability, internal heat demand and backup fuel.

OutputVerified preliminary heat balance
03

Utility design

Define boiler, omi, condensate, header and emissions interfaces.

OutputConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

OutputMeasurable project acceptance sheet
PROJECT FAQ

Questions to resolve before configuration.

Answers define the engineering boundary; they do not replace representative material testing or local compliance review.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, ijona, boiler, omi itọju, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

PROJECT ENGINEERING REVIEW

Define the material before selecting the equipment.

Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.

Bẹrẹ Project Review
KATALOGUE-ALIGNED Ipilẹ ẹrọ

Carbonization pẹlu egbin-ooru nya ipese

Tunto laini carbonization ati gbigba fifuye nya si lati iwọn ooru kan ati iwọntunwọnsi pupọ.

01

Ohun elo ti nwọle

Baomass ti a ti pese pẹlu profaili ifunni wakati/ojoojumọ ati ipinnu erogba sipesifikesonu.

02

Awọn abajade ti a nireti

Biochar ati ṣiṣan igbona idoti ti o peye fun iṣẹ nyanu ti o gba.

03

Awọn atọkun ise agbese

Gbigbe ifunni, carbonization gaasi, ijona, egbin-ooru igbomikana, omi itọju, nya titẹ / fifuye ati awọn ọna Iṣakoso.

Awoṣe ATI Opin Forukọsilẹ

Lo nikan kana ibaamu ala ilana ti o yan.

Itọkasi katalogiAgbaraAgbaraapoowe ti araAala to wa
SXTD820Ilọsiwaju carbonization1–2 m³/h95 kW600 m² katalogi ilẹ itọkasiPese baomasi lemọlemọfún carbonization laini
SXTD1200Ilọsiwaju carbonization3–5 m³/wakati110 kW650 m² katalogi ilẹ itọkasiPese baomasi lemọlemọfún carbonization laini
SXTD1500Ilọsiwaju carbonization5–8 m³/h153 kW800 m² katalogi ilẹ itọkasiPese baomasi lemọlemọfún carbonization laini
SXTD1800Ilọsiwaju carbonization8–10 m³/wakati178 kW800 m² katalogi ilẹ itọkasiPese baomasi lemọlemọfún carbonization laini
SXTD2000 - 10-14 kilasiIlọsiwaju carbonization10–14 m³/h190 kW850 m² katalogi ilẹ itọkasiKatalogi tẹjade SXTD2000 fun kilasi yii
SXTD2000 - 14-17 kilasiIlọsiwaju carbonization14–17 m³/h220 kW850 m² katalogi ilẹ itọkasiKatalogi tun SXTD2000; ik awoṣe koodu nbeere kọ ìmúdájú

Ofin iṣeto ni: katalogi agbara ni a itọkasi igbogun. Idurosinsin losi, fi sori ẹrọ / ṣiṣẹ agbara, ifẹsẹtẹ, imularada, mimọ, awọn itujade ati ibeere ohun elo nilo atokọ ohun elo ti a fọwọsi, ohun elo aṣoju ati awọn ipo gbigba kikọ.

Alaye ti o nilo ṣaaju iṣeto ati asọye

  1. Awọn fọto ohun elo aṣoju, ni pato ati ki o wa ayẹwo.
  2. Agbara ti a beere pẹlu awọn wakati fun ayipada kan, iṣinipo fun ọjọ kan ati ki o ṣiṣẹ ọjọ.
  3. Awọn abajade ibi-afẹde, ọna iṣapẹẹrẹ ati ibosile awọn ibeere olugba.
  4. Orilẹ-ede ojula, agbara to wa, idana, omi, fisinuirindigbindigbin air ati ile ifilelẹ.
  5. Ayika agbegbe, ina, ibi ipamọ ati iṣẹ-ailewu awọn ibeere.
  6. Ti beere aala ifijiṣẹ: ohun elo, ifilelẹ, fifi sori ẹrọ, Ifiranṣẹ ati ikẹkọ.