Turn stable carbonization heat into useful industrial steam.
A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Keep carbon quality and steam reliability under separate control
The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.
- 01Biomass drying and feeding
- 02Kupitiriza carbonization
- 03Dust and condensable separation
- 04Gas cleaning and controlled combustion
- 05Steam generation and water treatment
- 06Distribution, metering and backup supply
Define the user before defining the boiler
Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.
Steam demand
Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.
Water system
Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.
Fuel stability
Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.
Interface boundary
Agree the battery limit for boiler house, steam header, metering, condensate return, civil works and operating responsibility.
Verify both carbon output and usable steam
Acceptance should be based on documented feedstock, operating conditions and measurement methods.
Carbon product
Record yield and product properties only against the tested biomass and agreed thermal program.
Steam output
Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.
Emissions boundary
Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.
Continuity plan
Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.
See the connected equipment boundary.
Reference visuals support early layout discussion. Final equipment, arrangement and interfaces are confirmed from the project material and site.
Translate project facts into an equipment list.
This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.
| System block | Typical scope | Configuration basis |
|---|---|---|
| Gas preparation | Fumbi, condensable and moisture control with safe buffering | Carbonization-gas variability and burner limits |
| Combustion system | Controlled burner, combustion chamber and safety interlocks | Steam duty, turndown and supplementary-fuel plan |
| Boiler island | Boiler, economizer, blowdown, instruments and protection | Pressure, temperature and operating code basis |
| Water and condensate | Treatment, deaeration, make-up water and condensate return | Source-water quality and user return conditions |
| Steam delivery | Header, metering, pressure control and backup interface | Minimum, normal and peak customer demand |
Kupititsa patsogolo ntchitoyo pokhapokha umboni wofunikira ulipo.
Chipata chilichonse chimatembenuza chidziwitso chamakasitomala kukhala chodziwika bwino chaukadaulo kapena malonda pazisankho lotsatira.
Load profile
Capture minimum, normal and peak demand plus continuity requirements.
ZotulutsaMetered or documented steam-demand basisEnergy balance
Match process-gas availability, internal heat demand and backup fuel.
ZotulutsaVerified preliminary heat balanceUtility design
Define boiler, madzi, condensate, header and emissions interfaces.
ZotulutsaConnected utility configurationAcceptance plan
Agree test feedstock, stable window, meters and backup behavior.
ZotulutsaMeasurable project acceptance sheetMafunso oti muwathetse musanasinthidwe.
Mayankho amatanthauzira malire a uinjiniya; salowa m'malo mwa kuyesa kwazinthu zoyimira kapena kuwunikiranso kutsatiridwa kwanuko.
What information is needed from the steam user?
Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.
Can process gas alone guarantee continuous steam supply?
Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.
What belongs in the steam-system boundary?
The scope may include gas treatment, kuyaka, boiler, mankhwala madzi, deaeration, blowdown, steam header, metering, condensate return and backup interfaces.
How should steam acceptance be measured?
Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.
Fotokozani zinthu musanasankhe zida.
Gawani mafotokozedwe oyimira zinthu, voliyumu yomwe ilipo, malo ndi zotsatira zomwe mukufuna. YUSHUNXIN adzagwiritsa ntchito mfundozo kukonzekera malire a ndondomeko yoyenera ndi zokambirana za kasinthidwe.
Carbonization ndi zinyalala-kutentha nthunzi kupereka
Konzani mzere wa carbonization ndikulandira kuchuluka kwa nthunzi kuchokera ku kutentha komwe kuyezedwa ndi kuchuluka kwa misa.
Zida zomwe zikubwera
Ma biomass okonzeka kuphatikiza mbiri ya chakudya cha ola / tsiku lililonse komanso mawonekedwe a carbon.
Zomwe zikuyembekezeka
Biochar ndi mtsinje woyenerera wa kutentha kwa zinyalala pa ntchito yomwe mwagwirizana.
Zolumikizana ndi polojekiti
Kudyetsa kuyanika, mpweya wa carbonization, kuyaka, boiler yotenthetsera, mankhwala madzi, kuthamanga kwa nthunzi / katundu ndi kuyendetsa ntchito.
Gwiritsani ntchito mzere wofanana ndi malire osankhidwa.
| Catalogue reference | Mphamvu | Mphamvu | Envelopu yakuthupi | Kuphatikizidwa malire |
|---|---|---|---|---|
| Chithunzi cha SXTD820Kupitiriza carbonization | 1-2 m³/h | 95 kW | 600 m² catalog catalog land reference | Kukonzekera zotsalira zazomera mosalekeza carbonization mzere |
| Chithunzi cha SXTD1200Kupitiriza carbonization | 3-5m³/h | 110 kW | 650 m² catalog catalog land reference | Kukonzekera zotsalira zazomera mosalekeza carbonization mzere |
| Chithunzi cha SXTD1500Kupitiriza carbonization | 5-8m³/h | 153 kW | 800 m² catalog catalog land reference | Kukonzekera zotsalira zazomera mosalekeza carbonization mzere |
| Chithunzi cha SXTD1800Kupitiriza carbonization | 8-10 m³/h | 178 kW | 800 m² catalog catalog land reference | Kukonzekera zotsalira zazomera mosalekeza carbonization mzere |
| Zithunzi za SXTD2000 - 10- kalasi 14Kupitiriza carbonization | 10-14 m³/h | 190 kW | 850 m² catalog catalog land reference | Catalog prints SXTD2000 ya kalasi iyi |
| Zithunzi za SXTD2000 - 14- kalasi 17Kupitiriza carbonization | 14-17m³/h | 220 kW | 850 m² catalog catalog land reference | Catalog ikubwereza SXTD2000; code yomaliza yachitsanzo imafuna chitsimikiziro cholembedwa |
Lamulo lokonzekera: catalogue ndi kalozera wokonzekera. Kupitilira kokhazikika, mphamvu zoyika / zogwirira ntchito, mapazi, kuchira, chiyero, zotulutsa ndi zofunikira zofunikira zimafunikira mndandanda wa zida zovomerezeka, zinthu zoimira ndi zolembedwa zovomerezeka.
Chidziwitso chofunikira musanasinthidwe ndi mawu
- Zithunzi zakuthupi zoimira, mafotokozedwe ndi zitsanzo zomwe zilipo.
- Kuchuluka kofunikira kuphatikiza maola pakusintha, kusintha kwa tsiku ndi tsiku la ntchito.
- Zotuluka zomwe mukufuna, njira yachitsanzo ndi zofunikira zolandirira pansi.
- Dziko latsamba, mphamvu zopezeka, mafuta, madzi, mpweya woponderezedwa ndi malire a nyumba.
- Zachilengedwe zakumaloko, moto, zosungirako ndi zofunika pa ntchito-chitetezo.
- Adapempha malire otumizira: zida, kamangidwe, kukhazikitsa, ntchito ndi maphunziro.