Configure carbon production, process-gas treatment, boiler duty and the customer steam load as a connected system.

YUSHUNXIN HEAT INTEGRATION

Turn stable carbonization heat into useful industrial steam.

A steam project should be designed around the receiving process load. Carbonization gas, supplementary fuel, boiler duty, water treatment and backup capacity must work as one operating system.

Reference continuous carbonization and heat-recovery line
01 / CONNECTED STEAM ROUTE

Keep carbon quality and steam reliability under separate control

The carbonizer creates the primary product; the energy train converts suitable process gas and heat into a controlled utility.

  1. 01Biomass drying and feeding
  2. 02Continuous carbonization
  3. 03Dust and condensable separation
  4. 04Gas cleaning and controlled combustion
  5. 05Steam generation and water treatment
  6. 06Distribution, metering and backup supply
02 / CUSTOMER LOAD BASIS

Define the user before defining the boiler

Food and chemical plants require a clear hourly steam profile, pressure, quality and continuity basis.

Steam demand

Provide minimum, normal and peak demand, operating hours, pressure, temperature and seasonal production schedule.

Water system

Define raw-water quality, treatment, deaeration, blowdown, condensate return and make-up-water capacity.

Fuel stability

Gas cleaning, buffer volume, burner turndown and supplementary fuel determine pressure stability during feed or quality changes.

Interface boundary

Agree the battery limit for boiler house, steam header, kupima mita, condensate return, civil works and operating responsibility.

03 / ACCEPTANCE BASIS

Verify both carbon output and usable steam

Acceptance should be based on documented feedstock, operating conditions and measurement methods.

Carbon product

Record yield and product properties only against the tested biomass and agreed thermal program.

Steam output

Meter flow, pressure and temperature during a defined stable operating window instead of using theoretical heat alone.

Emissions boundary

Identify combustion, particulate and condensable controls and the local monitoring or permit requirements.

Continuity plan

Define startup, shutdown, maintenance, low-gas operation and backup-steam behavior for the receiving plant.

UWEKEZAJI WA REJEA

Tafsiri ukweli wa mradi katika orodha ya vifaa.

Matrix hii ya marejeleo inaonyesha mantiki ya uamuzi. Kiasi cha mwisho, miundo na violesura ni vya pendekezo la mradi lililoidhinishwa.

Kizuizi cha mfumoUpeo wa kawaidaMsingi wa usanidi
Gas preparationVumbi, condensable and moisture control with safe bufferingCarbonization-gas variability and burner limits
Combustion systemControlled burner, combustion chamber and safety interlocksSteam duty, turndown and supplementary-fuel plan
Boiler islandBoiler, economizer, blowdown, instruments and protectionPressure, temperature and operating code basis
Water and condensateTreatment, deaeration, make-up water and condensate returnSource-water quality and user return conditions
Steam deliveryHeader, kupima mita, pressure control and backup interfaceMinimum, normal and peak customer demand
NJIA YA MAAMUZI YA HATUA

Kuendeleza mradi tu wakati ushahidi unaohitajika unapatikana.

Kila lango hugeuza maelezo ya mteja kuwa matokeo yaliyobainishwa ya kiufundi au ya kibiashara kwa uamuzi unaofuata.

01

Load profile

Capture minimum, normal and peak demand plus continuity requirements.

PatoMetered or documented steam-demand basis
02

Usawa wa nishati

Match process-gas availability, internal heat demand and backup fuel.

PatoVerified preliminary heat balance
03

Utility design

Define boiler, maji, condensate, header and emissions interfaces.

PatoConnected utility configuration
04

Acceptance plan

Agree test feedstock, stable window, meters and backup behavior.

PatoMeasurable project acceptance sheet
MASWALI YA MRADI

Maswali ya kutatua kabla ya kusanidi.

Majibu hufafanua mpaka wa uhandisi; hazichukui nafasi ya upimaji wa nyenzo wakilishi au ukaguzi wa kufuata wa ndani.

What information is needed from the steam user?

Provide minimum, normal and peak steam demand, pressure, temperature, operating schedule, condensate return, water quality and continuity requirement.

Can process gas alone guarantee continuous steam supply?

Not without verification. Buffering, burner turndown, supplementary fuel and backup capacity may be needed when feedstock or gas production varies.

What belongs in the steam-system boundary?

The scope may include gas treatment, combustion, boiler, water treatment, deaeration, blowdown, steam header, kupima mita, condensate return and backup interfaces.

How should steam acceptance be measured?

Use metered flow, pressure and temperature during a defined stable operating window with the agreed biomass, carbonization conditions and auxiliary loads.

UHAKIKI WA UHANDISI WA MRADI

Fafanua nyenzo kabla ya kuchagua kifaa.

Shiriki maelezo ya nyenzo ya mwakilishi, kiasi kinachopatikana, hali ya tovuti na matokeo lengwa. YSHUNXIN itatumia ukweli huo kuandaa mpaka wa mchakato husika na majadiliano ya usanidi.

Anza Ukaguzi wa Mradi
CATALOGUE-ALIGNED ENGINEERING BASIS

Carbonization with waste-heat steam supply

Configure the carbonization line and receiving steam load from one measured heat and mass balance.

01

Incoming material

Prepared biomass plus hourly/daily feed profile and target carbon specification.

02

Expected outputs

Biochar and a qualified waste-heat stream for an agreed steam duty.

03

Project interfaces

Feed drying, carbonization gas, combustion, waste-heat boiler, water treatment, steam pressure/load and operating control.

MODEL AND SCOPE REGISTER

Use only the row matching the selected process boundary.

Catalogue referenceUwezoNguvuPhysical envelopeIncluded boundary
SXTD820Continuous carbonization1–2 m³/h95 kW600 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1200Continuous carbonization3–5 m³/h110 kW650 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1500Continuous carbonization5–8 m³/h153 kW800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD1800Continuous carbonization8–10 m³/h178 kW800 m² catalogue land referencePrepared biomass continuous carbonization line
SXTD2000 - 10–14 classContinuous carbonization10–14 m³/h190 kW850 m² catalogue land referenceCatalogue prints SXTD2000 for this class
SXTD2000 - 14–17 classContinuous carbonization14–17 m³/h220 kW850 m² catalogue land referenceCatalogue repeats SXTD2000; final model code requires written confirmation

Configuration rule: catalogue capacity is a planning reference. Stable throughput, installed/operating power, footprint, recovery, purity, emissions and utility demand require the approved equipment list, representative material and written acceptance conditions.

Information required before configuration and quotation

  1. Representative material photos, specifications and available sample.
  2. Required capacity plus hours per shift, shifts per day and operating days.
  3. Matokeo lengwa, sampling method and downstream receiver requirements.
  4. Site country, available power, fuel, maji, compressed air and building limits.
  5. Local environmental, fire, storage and occupational-safety requirements.
  6. Requested delivery boundary: vifaa, mpangilio, installation, commissioning and training.